87

Production Boms and Routing Version for Variant

Many times i need to implement something to manage different Production BOM and Routing for different Item Variants. I think that should be very useful if this issue could be standard. To do it I ass Routing No. VERSION, and Production Bom Version on Item Variants, and i change all the functions ...

Read more...

10 Comments

Read more... 10 Comments

Category: Manufacturing (58)

STATUS DETAILS
Under Review
Ideas Administrator
Thank you for this suggestion! Currently this is not on our roadmap. We are tracking this idea and if it gathers more votes and comments we will consider it in the future.

Best regards,
Business Central Team
62

Fixed Quantity BOM items

It has been asked for many times by customers to have the ability to do fixed quantity BOM items. For example if you use 1 of a particular component no matter what quantity the production order is for you could set the item up as fixed quantity with the quantity = 1. This would also be valuable i...

Read more...

2 Comments

Read more... 2 Comments

Category: Manufacturing (58)

STATUS DETAILS
Needs Votes
58

Production BOM and Routings by Location

For our customers that have multiple locations, they may require a different BOMs and Routings for the same item due to differences in the location's production lines/machines/etc. It would be great if Production BOMs and Routings could be set up by location so that the correct one comes into pr...

Read more...

7 Comments

Read more... 7 Comments

Category: Manufacturing (58)

STATUS DETAILS
Under Review
57

One-to-Many Manufacturing

Ability to have one item consumed and many items produced out of it, as a manufacturing type. Could be used in many different scenarios, as for example: - fabric cutting - all kind of animals farming for meat - CNC cutting, etc. Rather for Manufacturing Category, if such is planned to be opened.

Read more...

3 Comments

Read more... 3 Comments

Category: Manufacturing (58)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback.

Have you analysed the Production Families feature: https://docs.microsoft.com/en-us/dynamics365/business-central/production-how-work-family, could you specify the missing functionality?

 

Sincerely,
Andrei Panko
PM, Microsoft

40

Consume "Rework" Finished Goods

In some manufacturing scenarios, when finished goods don't meet quality parameters, the finished good can be corrected by adding it to the raw materials consumed in a new production of the same item. Currently, NAV/BC doesn't allow a an item to be the output and the consumption. This is a good ...

Read more...

2 Comments

Read more... 2 Comments

Category: Manufacturing (58)

STATUS DETAILS
Needs Votes
35

Production Order Scheduling capability (Schedule vs plan)

Currently the production order Due Date, Ending Data and Start dates are all calculated and validated with any change to any of the dates which makes it impossible to schedule production orders with any flexibility related to starting and ending. Many of our customers would like to add schedul...

Read more...

1 Comments

Read more... 1 Comments

Category: Manufacturing (58)

STATUS DETAILS
Needs Votes
34

Cancel a Production Order with Consumption

Occasionally, a user will post consumption on a production order and then realize they made a mistake. They can post negative consumption to undo the erroneous consumption, but NAV/BC does not allow them to finish or delete the production order because there is no output. The work around is to ...

Read more...

3 Comments

Read more... 3 Comments

Category: Manufacturing (58)

STATUS DETAILS
Needs Votes
30

When a gantt diagram on BC like Preactor?

It would be great to have a gantt diagram on BC on cloud and on promise. I do not understand why on BC or NAV it is not available. Thanks you. JUAN MEGIAS.

Read more...

5 Comments

Read more... 5 Comments

Category: Manufacturing (58)

STATUS DETAILS
Needs Votes
Ideas Administrator
Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future. 

Sincerely,
Ivan Koletic
PM, Microsoft
25

Variant on Production BOM Line

When a Customer has ie a Production BOM for trousers, and these trousers comes in different lengths - then you should be able to state this on the Production BOM Lines: ie Trousers Variant 100 needs 100 meters of string and Trousers Variant 150 needs 150 meters of string - or maybe even another ...

Read more...

2 Comments

Read more... 2 Comments

Category: Manufacturing (58)

STATUS DETAILS
Declined
Ideas Administrator

Thank you for reaching out. Your suggestion seems to be a duplicate of the following suggestion: 
https://experience.dynamics.com/ideas/idea/?ideaid=5413e77d-356b-e911-b047-0003ff68e45b

Please add your valuable votes and comments to the suggestion above instead.

 

Sincerely,
Andrei Panko
PM, Microsoft

20

Disassembly /production Orders

Create a function for disassembly orders Production an Assembly types). This would allow the users to create the order , consume the same item as the source and then output / adjust in or un-consume the components they choose to return to stock. This could in theory be a worksheet / Journal th...

Read more...

2 Comments

Read more... 2 Comments

Category: Manufacturing (58)

STATUS DETAILS
Needs Votes
Ideas Administrator
Thank you for this suggestion! Currently this is not on our roadmap. We are tracking this idea and if it gathers more votes and comments we will consider it in the future.

Best regards,
Business Central Team