Automate Clock Out Worker
With a recent update, we are now able to automate the Approve and Transfer Time and Attendance Registrations that get created through the Job card terminal. The problem is, sometimes these jobs encounter errors because of workers who are missing a clock out for a given profile date. It would b...
Remove link between Production order scheduling and picking work
We do not see the functional need for the current link between having open picking work for a production order and the ability to (re) schedule that order. It creates a big problem. If one runs a scheduling batch to make sure orders are rescheduled regularly, any open picking work makes schedulin...
Prod order shortage screen
The "prod orders to release" that indicates material shortages with yellow triangle is unusable and needs to be drastically changed: -remove any prefilter on having a production unit on your resource group. This is optional functionality. THe system works fine without production units and it make...
Timing of validation should be while line is added and not during re-estimation
Repro steps:
1.I create a Production order
Continuous BOM consumption
In a lot of cases/industries the usage of raw material during a route is not at start nor at finish of a route operation but has a continuous input/material usage. As Dynamics does not have an option to split this usage for example per day, hour or other definable period our purchase Master Pl...
Extend decimal precision in the Times field on an operation and resource
The 'Times' field when entering 1/60 rounds to a 4 decimal precision. This makes the result .0167. When applying this result to the time on a production order the extended value is 'off' from the expected value. For example:
15 minutes = .25 hours, BUT
in D365 15 minutes = .250...
Production Floor Management - Fix Jobs with Deviation Calculation
When new resource group membership records are created and the old membership becomes expired, the jobs with deviation calculation doesn't work correctly. Issue was submitted to Microsoft and the response was the calculation by design was not excluding the expired resource group membership record...
Half day for special day
For time and attendance special day, we need half day because we have employees with 4 and half day work calendar. When we have a special day we give a full day but spent on two days. As example: normal calendar is from monday to thurday 8h-17h and friday from 8h -12h. When we have a special d...
Add Validation to Production Order Transactions when a Project Activity is not specified but required by the Project
When creating a production order from a project and the project is setup to "REQUIRE ACTIVITY ON JOURNALS" for hours. There is a situation where the production order can post journals without validating against this required field which can cause an employee to get "stuck" working on a job in th...
Adjust duration on production job based on already RAFed quantities
Make it possible to adjust duration on production job based on already RAFed quantities.
For example, production order is for 500 pcs, route specified 1min/pcs.
When originally scheduled, production job was for 500 mins.
Then I posted job card for 5...