Batch order report as finished 0 good quantity for standard items
Currently It is not possible to end a production order with RAF = 0 good quantity and 100% scrap for standard cost items. It through "Missing report as finished quantity" error. But this is a possible scenario that when you planned to produce something. Maybe you started operation 10 and that fa...
BOM of serial numbers / batches
There should be a way to register serial numbers (as well as batches) in a kind of a BOM structure to fulfill tracking requirements by item. With standard D365fO, it’s only possible with PO of quantity 1, which is a no go for customers.
The functionality should work without the ne...
Thank you for your feedback. We released this feature as part of the release 10.0.40.
Sincerely,
Johan Hoffmann
PM, Microsoft
Use Manufacturing Execution/Production Floor Execution without posting actual time
Production floor execution (PFE) is a great interface for operators to report progress and consumed material on operations. However, in many occasions it is not wished to capture actual time spent (actually this requirement has been a reality in basically all my projects, at least for some rou...
Thank you for your feedback. We released this feature as part of the functionality in release 10.0.41.
Please refer to the following link for more information:
https://go.microsoft.com/fwlink/?linkid=2275136
Sincerely,
Johan Hoffmann
PM, Microsoft
Enable the material availability check for production orders that are operations scheduled
At this stage, the material availability check is only available for production orders that are job scheduled. There is not really a good reason why operations scheduled orders would require a different process. Please enable the functionality for the operations scheduled production orders.
Thank you for your feedback. We released this feature and it is named Material availability check for operations scheduled production orders in release 10.0.34.
Sincerely,
Johan Hoffmann
PM, Microsoft
manufacturing execution: stop working indirect activity
You could take a break and log back in immediately to bring back to System Waiting. So there's no Standard solution to stop indirect activity and start a new production Job or Project Job directly.
Thank you for your feedback. This functionality is added under "Automatically stop and resume production jobs for indirect activities in production floor execution" feature.
Kind Regards,
Inna Kharkivska
SE, Microsoft
Job Card Device is missing functionality to manage Process Manufacturing and other functions included with Job Card Terminal
The touch screen functionality of the Job Card Device and ease of use provides enhanced application needed for Shop Floor, however, the current design is limited and will need further enhancements to meet very important business requirements.
Customer has identified the following requir...
Thank you for your feedback.
The Job card device has been deprecated, and has been replaced with the Production floor execution interface.
The Production floor execution interface is now fully supporting execution of batch orders for process manufacturing. Important functionality released for the interface includes:
- Ability to Report as finished batch orders with co-products and by-products as well as planning items
- Assistant/Assist resource
- View Balance and Log Book
- Bundle jobs
- Search the job list by Project ID or Item ID for finished goods.
Best regards,
Johan Hoffmann, PM, Microsoft
Quality management in production floor execution interface (PFE)
I would like to receive your votes for the following functionality in the production floor execution interface (PFE):
- It should be possible for users of PFE to enter test results for quality orders generated with a route specific quality association.
- It should be possible...
STATUS DETAILSCompleted
Thank you for your feedback. We released this feature as part of the functionality in "Record test results from the production floor execution interface" in 10.0.46 release.​
​
Sincerely,​
Inna Kharkivska​
Software Engineer, Microsoft
Registration on project activities on the production floor execution interface (PFE)
On the production floor execution interface (PFE), workers should be able to register time spent on project activities. It should be possible to enable this option by configuration for example by adding a new tab to the configuration for project related tasks.
Thank you for your feedback. We released this feature as part of the release 10.0.41.
Sincerely,
Johan Hoffmann
PM, Microsoft
Link operations secondary to primary to register the time and cost of several resources on PFE
Business Case:
The production route has 2 or more resources, for example: a machine, a mold and an operator. the 3 resources must add costs to the order, each mold, each machine and each person have a different cost category
Thank you for your feedback. We released this feature as part of the functionality in "Auto-complete secondary operation with primary".​
Sincerely,
Inna Kharkivska
Software engineer, Microsoft
Display Route operation name in relevant forms
The route operation name (RouteOprTable.OprName) is currently not displayed next to the route operation id in forms where this is relevant (e.g. Route details). It is not possible either to add this field manually via personalisation. As the Operation id can only contain 10 characters, display...
Thank you for your feedback. This feature will be released in version 10.0.29.
Sincerely,
Johan Hoffmann
Product Manager, Microsoft

Administrator
Thank you for your feedback. We released this feature as part of the release 10.0.38.
Sincerely,
Johan Hoffmann
PM, Microsoft