BOM of serial numbers / batches
There should be a way to register serial numbers (as well as batches) in a kind of a BOM structure to fulfill tracking requirements by item. With standard D365fO, it’s only possible with PO of quantity 1, which is a no go for customers.
The functionality should work without the ne...
Maintain resource selection across operations
Dynamics 365 appears to have a weakness in its functionality regarding the ability to maintain the same resource assignment on multiple successive operations on a route where capacity permits. I have a route as follows, where I have a group of machines (let's say Machine1, Machine2, and Machin...
Thank you for your feedback.
This is a great suggestion! We will consider this in our roadmap.
Sincerely,
Johan Hoffmann, Program Manager
Microsoft.
Use Manufacturing Execution/Production Floor Execution without posting actual time
Production floor execution (PFE) is a great interface for operators to report progress and consumed material on operations. However, in many occasions it is not wished to capture actual time spent (actually this requirement has been a reality in basically all my projects, at least for some rou...
Thank you for your feedback. This is a great suggestion!
Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.
Sincerely,
Johan Hoffmann
PM, Microsoft
Report scrap quantity from mobile device
It would be great advantage to be able to not only report a good quantity as finished with the mobile device menu items "Report as finish" and "Report as finish and put away", but also be able to report a scrap quantity at the same time. The handling/posting of the material for the scrap quant...
Thank you for your feedback. This is a great suggestion! We will consider this in our roadmap.
Sincerely,
Johan Hoffmann
PM, Microsoft
manufacturing execution: stop working indirect activity
You could take a break and log back in immediately to bring back to System Waiting. So there's no Standard solution to stop indirect activity and start a new production Job or Project Job directly.
Thank you for your feedback. This is a great suggestion! We will consider this in our roadmap.
Sincerely,
Conrad Volkmann
PM, Microsoft
Print BOM information option when releasing production orders.
Some of the manufacturing companies require the possibility to print BOM information when releasing production orders, similarly as route card information can be printed. After printing on paper, this documentation is then sent to production floor. The production BOM will provide an overview o...
Thank you for your feedback. This is a great suggestion! We will consider this in our roadmap.
Sincerely,
Johan Hoffmann
PM, Microsoft
Quality management in production floor execution interface (PFE)
I would like to receive your votes for the following functionality in the production floor execution interface (PFE):
- It should be possible for users of PFE to enter test results for quality orders generated with a route specific quality association.
- It should be possible...
STATUS DETAILSUnder Review
Thank you for your feedback. This is a great suggestion!
Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.
Sincerely,
Johan Hoffmann
PM, Microsoft
Request new material from production floor execution interface (WMS-enabled)
with the new functionality; (Preview) Register material consumption on the production floor execution interface (WMS-enabled) you can move, from the storage locations to the resource location, more quantity than requested in the BOM (for example a full pallet) and you can consume more quantity...
Thank you for your feedback. This is a great suggestion! We will consider this in our roadmap.
Sincerely,
Johan Hoffmann
PM, Microsoft
Gantt chart should be able to sort on start date instead of production ID
We have a lot of small production orders, scheduled on a certain resource. If you open the Gantt chart directly from the resource (or resource group), the information shown is sorted by production order number (and operation ID). A possibility should exist to sort on the scheduled Start Date in...
Thank you for your feedback.
This is a great suggestion! We will consider this in our roadmap.
Sincerely,
Johan Hoffmann, Program Manager
Microsoft.
Cannot save filtered view in production floor execution interface.
After filtering the columns in the production floor execution interface and saving it as a view, the filtered value disappears upon leaving or refreshing the form.
Despite being previously identified as a By-Design issue (857459), clients who are unable to filter and sort thei...
Thank you for your feedback.
Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.
Sincerely,
Johan Hoffmann
PM,
Microsoft.
Administrator
Thank you for your feedback. This is a great suggestion! We will consider this in our roadmap.
Sincerely,
Per Lykke Lynnerup
PM, Microsoft