1

Change BOM Feature - Similar to Change Route

It would be great if you could implement a Change BOM feature that would allow the user to change the BOMId on multiple Scheduled Production Orders at once.


This functionality was recently released for mass changing routes, as...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (476)

STATUS DETAILS
New
8

Re-schedule production order after update route resource quantity, resource is not assigned to the updated jobs, need user manual click job update on production all jobs form and then re-schedule the production order

After the production order job is started, user want to increase other route resource quantity, and then update the route and reschedule the production order. Resources are not assigned to the updated jobs. Only users cli...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (476)

STATUS DETAILS
New
4

MES Integration - Coproducts

Please add the capability to send a message for co/by project journals to the Manufacturing Execution System (MES) integration. This would support process industries, such as chemicals and coil processing.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (476)

STATUS DETAILS
New
4

MES integration - Lean Kanbans

Please add support for reporting against Kanbans when integrating with Manufacturing Execution Systems (MES).

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (476)

STATUS DETAILS
New
2

Production Floor Execution - Don't notified good quantity in each operation

In the "Production Floor Execution", when reporting the progress of operations, the display always appears to indicate the number of good parts that have been manufactured.


Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (476)

STATUS DETAILS
New
1

FIX - Linked screen production order -> explosion -> planned orders is not updated when selecting different production order

Hi,


When selecting a production order and opening the explosion (by clicking on "View" > "Explosion"), the planned order linked to the explosion can be accessed by clicking on the planned orders (if they haven't been firmed yet).

As the planned order are opened there is...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (476)

STATUS DETAILS
New
1

Expected to have warning message when using non-approved or non-existent BOM version and system should prevent Updating a BOM line item inherits the same Sub-BOM and Subroute information if they are not related.

Updated BOM Line item used the same Sub-BOM and Subroute from the previous item


1. During creation of BOM version, all BOM are created instead of the only approved for the related item number. Is there an out of the box feature for this?



Ideally, i...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (476)

STATUS DETAILS
New
11

Production Floor Execution - reflect ajdusted material reservation in open picking list

When updating material reservation before reporting progress on a job in production floor execution, open BOM transactions are correctly updated but the picking list is not which leads to display incomplete information on the ajdust material screen.


At the same time, as soon a...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (476)

STATUS DETAILS
New
4

Add additional material from the MES

Currently in the form: Adjust material in the MES user indicates the qty of material being used. However, the user can only adjust components included in the BOM/Formula.

This idea is to allow the user to add additional components for the production order, the same way is done in the the...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (476)

STATUS DETAILS
New
7

Improve master planning of long-lead time items transferred to distribution warehouse

Our client has a distribution warehouse and a manufacturing warehouse. The manufactured stock is always transferred in full to the distribution warehouse (manufactured stock is not stored in the manufacturing warehouse).

 

If the system falls below safety stock within the lead time...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (476)

STATUS DETAILS
Needs Votes