2

Timing of validation should be while line is added and not during re-estimation

fter a Production order is created if we add a Phantom item when that item does not have a valid BOM, the system throws error while re-estimation. Ideally it should throw error while the line is being added.

Repro steps:
1.I create a Production order

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (237)

STATUS DETAILS
Needs Votes
4

Continuous BOM consumption

In a lot of cases/industries the usage of raw material during a route is not at start nor at finish of a route operation but has a continuous input/material usage. As Dynamics does not have an option to split this usage for example per day, hour or other definable period our purchase Master Pl...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (237)

STATUS DETAILS
Under Review
4

Extend decimal precision in the Times field on an operation and resource

The 'Times' field when entering 1/60 rounds to a 4 decimal precision. This makes the result .0167. When applying this result to the time on a production order the extended value is 'off' from the expected value. For example:

15 minutes = .25 hours, BUT
in D365 15 minutes = .250...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (237)

STATUS DETAILS
Under Review
1

Production Floor Management - Fix Jobs with Deviation Calculation

When new resource group membership records are created and the old membership becomes expired, the jobs with deviation calculation doesn't work correctly. Issue was submitted to Microsoft and the response was the calculation by design was not excluding the expired resource group membership record...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (237)

STATUS DETAILS
Completed
10

Half day for special day

For time and attendance special day, we need half day because we have employees with 4 and half day work calendar. When we have a special day we give a full day but spent on two days. As example: normal calendar is from monday to thurday 8h-17h and friday from 8h -12h. When we have a special d...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (237)

STATUS DETAILS
Needs Votes
1

Add Validation to Production Order Transactions when a Project Activity is not specified but required by the Project

When creating a production order from a project and the project is setup to "REQUIRE ACTIVITY ON JOURNALS" for hours. There is a situation where the production order can post journals without validating against this required field which can cause an employee to get "stuck" working on a job in th...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (237)

STATUS DETAILS
Needs Votes
3

Adjust duration on production job based on already RAFed quantities

Make it possible to adjust duration on production job based on already RAFed quantities.



For example, production order is for 500 pcs, route specified 1min/pcs.

When originally scheduled, production job was for 500 mins.

Then I posted job card for 5...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (237)

STATUS DETAILS
Needs Votes
8

Instructions in Job card - show attached documents of the variant

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (237)

STATUS DETAILS
Needs Votes
14

Prevent deletion of ended production orders

When a production order has the production status Ended, it is possible to delete that production order.
Proposed solution: this should be allowed or restricted by a new production parameter.

When a production order is in status Created, you can delete that production order, wh...

Read more...

2 Comments

Read more... 2 Comments

Category: Production Control (237)

STATUS DETAILS
Needs Votes
15

Route property check on secondary operations

Property on a route can be used to allocate resources within a calendar day to work with different kind of tasks in different time periods. Currently, production scheduling is only checking property of primary operations, when in e.g. healthcare industry it would be most beneficial to have check ...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (237)

STATUS DETAILS
Under Review