219

Batch order report as finished 0 good quantity for standard items

Currently It is not possible to end a production order with RAF = 0 good quantity and 100% scrap for standard cost items. It through "Missing report as finished quantity" error. But this is a possible scenario that when you planned to produce something. Maybe you started operation 10 and that fa...

Read more...

21 Comments

Read more... 21 Comments

Category: Production Control (519)

STATUS DETAILS
Completed
Ideas Administrator

Thank you for your feedback. We released this feature as part of the release 10.0.38.

Sincerely,

Johan Hoffmann

PM, Microsoft

141

Cannot save filtered view in production floor execution interface.

After filtering the columns in the production floor execution interface and saving it as a view, the filtered value disappears upon leaving or refreshing the form.


Despite being previously identified as a By-Design issue (857459), clients who are unable to filter and sort thei...

Read more...

5 Comments

Read more... 5 Comments

Category: Production Control (519)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback.

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann 

PM,

Microsoft.

123

Report scrap quantity from mobile device

It would be great advantage to be able to not only report a good quantity as finished with the mobile device menu items "Report as finish" and "Report as finish and put away", but also be able to report a scrap quantity at the same time. The handling/posting of the material for the scrap quant...

Read more...

4 Comments

Read more... 4 Comments

Category: Production Control (519)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback. This is a great suggestion! We will consider this in our roadmap.

 

Sincerely,

Johan Hoffmann

PM, Microsoft 

112

Quality management in production floor execution interface (PFE)

I would like to receive your votes for the following functionality in the production floor execution interface (PFE):

  • It should be possible for users of PFE to enter test results for quality orders generated with a route specific quality association.
  • It should be possible...

    Read more...

    8 Comments

    Read more... 8 Comments

    Category: Production Control (519)

    STATUS DETAILS
    Under Review
    Ideas Administrator

    Thank you for your feedback. This is a great suggestion!

    Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

     

    Sincerely,

    Johan Hoffmann

    PM, Microsoft

89

Gantt chart should be able to sort on start date instead of production ID

We have a lot of small production orders, scheduled on a certain resource. If you open the Gantt chart directly from the resource (or resource group), the information shown is sorted by production order number (and operation ID). A possibility should exist to sort on the scheduled Start Date in...

Read more...

7 Comments

Read more... 7 Comments

Category: Production Control (519)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback.

This is a great suggestion! We will consider this in our roadmap.

Sincerely,

Johan Hoffmann, Program Manager

Microsoft.

63

Quality order generation based on a time interval

Currently there is no functionality to have a quality order automatically generated based on a time interval i.e. have a quality order automatically generated every x number of hours against a production order which is in progress.


This functionality would allow a person who i...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback. This is a great suggestion! We will consider this in our roadmap.

Sincerely,

Johan Hoffmann

PM, Microsoft 

44

Feature Finite material scheduling for Planning Optimization should not thorw errors when enabled

We recently faced the situation of a trying to split a production order, and coming with a system error:

Function ProdUpdSchedulingMps_Extension.updateSchedule has been incorrectly called”


Read more...

2 Comments

Read more... 2 Comments

Category: Production Control (519)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback.

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann 

PM,

Microsoft.

42

Remove link between Production order scheduling and picking work

We do not see the functional need for the current link between having open picking work for a production order and the ability to (re) schedule that order. It creates a big problem. If one runs a scheduling batch to make sure orders are rescheduled regularly, any open picking work makes schedulin...

Read more...

3 Comments

Read more... 3 Comments

Category: Production Control (519)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback.

This is a great suggestion! We will consider this in our roadmap.

Sincerely,

Johan Hoffmann, Program Manager

Microsoft.

40

Intercompany subcontracting process

Currently in D365 F&O it's not possible to manage the subcontracting intercompany process.


It could be very useful to have a complete tracking of the intercompany subcontracting process.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback.

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann 

PM,

Microsoft.

38

Post notes or documents into production orders from production floor execution

In production floor execution it should be really great if there were a possibility to add comments/notes/files attached to the production order you are giving feedback to. It is possible to add instructions from the production order into the PFE but not possible to add some feedback into the ...

Read more...

2 Comments

Read more... 2 Comments

Category: Production Control (519)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. This is a great suggestion!

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Johan Hoffmann

PM, Microsoft