219

Batch order report as finished 0 good quantity for standard items

Currently It is not possible to end a production order with RAF = 0 good quantity and 100% scrap for standard cost items. It through "Missing report as finished quantity" error. But this is a possible scenario that when you planned to produce something. Maybe you started operation 10 and that fa...

Read more...

21 Comments

Read more... 21 Comments

Category: Production Control (530)

STATUS DETAILS
Completed
Ideas Administrator

Thank you for your feedback. We released this feature as part of the release 10.0.38.

Sincerely,

Johan Hoffmann

PM, Microsoft

149

Cannot save filtered view in production floor execution interface.

After filtering the columns in the production floor execution interface and saving it as a view, the filtered value disappears upon leaving or refreshing the form.


Despite being previously identified as a By-Design issue (857459), clients who are unable to filter and sort thei...

Read more...

5 Comments

Read more... 5 Comments

Category: Production Control (530)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback.

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann 

PM,

Microsoft.

139

BOM of serial numbers / batches

There should be a way to register serial numbers (as well as batches) in a kind of a BOM structure to fulfill tracking requirements by item. With standard D365fO, it’s only possible with PO of quantity 1, which is a no go for customers.

The functionality should work without the ne...

Read more...

5 Comments

Read more... 5 Comments

Category: Production Control (530)

STATUS DETAILS
Completed
Ideas Administrator

Thank you for your feedback. We released this feature as part of the release 10.0.40.

Sincerely,

Johan Hoffmann

PM, Microsoft

134

Maintain resource selection across operations

Dynamics 365 appears to have a weakness in its functionality regarding the ability to maintain the same resource assignment on multiple successive operations on a route where capacity permits. I have a route as follows, where I have a group of machines (let's say Machine1, Machine2, and Machin...

Read more...

4 Comments

Read more... 4 Comments

Category: Production Control (530)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback.

This is a great suggestion! We will consider this in our roadmap.

Sincerely,

Johan Hoffmann, Program Manager

Microsoft.

131

Use Manufacturing Execution/Production Floor Execution without posting actual time

Production floor execution (PFE) is a great interface for operators to report progress and consumed material on operations. However, in many occasions it is not wished to capture actual time spent (actually this requirement has been a reality in basically all my projects, at least for some rou...

Read more...

9 Comments

Read more... 9 Comments

Category: Production Control (530)

STATUS DETAILS
Completed
Ideas Administrator

Thank you for your feedback. We released this feature as part of the functionality in release 10.0.41.

Please refer to the following link for more information:

https://go.microsoft.com/fwlink/?linkid=2275136

 

Sincerely,

Johan Hoffmann

PM, Microsoft

123

Enable the material availability check for production orders that are operations scheduled

At this stage, the material availability check is only available for production orders that are job scheduled. There is not really a good reason why operations scheduled orders would require a different process. Please enable the functionality for the operations scheduled production orders.

Read more...

9 Comments

Read more... 9 Comments

Category: Production Control (530)

STATUS DETAILS
Completed
Ideas Administrator

Thank you for your feedback. We released this feature and it is named Material availability check for operations scheduled production orders in release 10.0.34.

Sincerely,

Johan Hoffmann

PM, Microsoft

119

Job Card Device is missing functionality to manage Process Manufacturing and other functions included with Job Card Terminal

The touch screen functionality of the Job Card Device and ease of use provides enhanced application needed for Shop Floor, however, the current design is limited and will need further enhancements to meet very important business requirements.

Customer has identified the following requir...

Read more...

8 Comments

Read more... 8 Comments

Category: Production Control (530)

STATUS DETAILS
Completed
Ideas Administrator

Thank you for your feedback. 

The Job card device has been deprecated, and has been replaced with the Production floor execution interface.

The Production floor execution interface is now fully supporting execution of batch orders for process manufacturing. Important functionality released for the interface includes:

  • Ability to Report as finished batch orders with co-products and by-products as well as planning items 
  • Assistant/Assist resource
  • View Balance and Log Book
  • Bundle jobs 
  • Search the job list by Project ID or Item ID for finished goods.

Best regards,
Johan Hoffmann, PM, Microsoft
116

Quality management in production floor execution interface (PFE)

I would like to receive your votes for the following functionality in the production floor execution interface (PFE):

  • It should be possible for users of PFE to enter test results for quality orders generated with a route specific quality association.
  • It should be possible...

    Read more...

    8 Comments

    Read more... 8 Comments

    Category: Production Control (530)

    STATUS DETAILS
    Completed
    Ideas Administrator

    Thank you for your feedback. We released this feature as part of the functionality in "Record test results from the production floor execution interface" in 10.0.46 release.​

    ​

    Sincerely,​

    Inna Kharkivska​

    Software Engineer, Microsoft

114

Request new material from production floor execution interface (WMS-enabled)

with the new functionality; (Preview) Register material consumption on the production floor execution interface (WMS-enabled) you can move, from the storage locations to the resource location, more quantity than requested in the BOM (for example a full pallet) and you can consume more quantity...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (530)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback. This is a great suggestion! We will consider this in our roadmap.

Sincerely,

Johan Hoffmann

PM, Microsoft 

114

manufacturing execution: stop working indirect activity

You could take a break and log back in immediately to bring back to System Waiting. So there's no Standard solution to stop indirect activity and start a new production Job or Project Job  directly.

Read more...

9 Comments

Read more... 9 Comments

Category: Production Control (530)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback. This is a great suggestion! We will consider this in our roadmap.

 

Sincerely,

Conrad Volkmann

PM, Microsoft