112

Quality management in production floor execution interface (PFE)

I would like to receive your votes for the following functionality in the production floor execution interface (PFE):

  • It should be possible for users of PFE to enter test results for quality orders generated with a route specific quality association.
  • It should be possible...

    Read more...

    8 Comments

    Read more... 8 Comments

    Category: Production Control (520)

    STATUS DETAILS
    Under Review
11

MES integration - Add AutomaticRouteConsumptionRule to start message

The new MES integration feature includes the possibility to send a start signal. This start signal do not include message about route consumption, which is standard if starting from the D365 client.


The issue at the moment is that the route consumption is then controlled by t...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Under Review
6

Dynamics 365 Production order finished good raw shortages inquiries and shortage tracking

Wish there is an option to easily visualize production order for finished good for associated for related BOM (s), raw components or elements for shortages. Not featuring shortage quick inquiries, before initiating a production order, user might process multiple inventory inquiries, or other.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Under Review
7

Production floor execution - Grid overview when reporting the progress of bundled jobs

It would be useful to add the option of reporting the progress of a job bundle from a grid, similarly to what happens when the job bundle is started.

Currently jobs are displayed sequentially: the first job is displayed, and after the quantity in entered you navigate to the next job in t...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Completed
3

Add an option to explode sub BOM items that have [Auto-report as finished] into separate BOM journals

Scenario:

  • While processing BOM journal for a finished product item that has semi-finished products (Sub BOM) that could have [Auto-report as finished] enabled, currently the system is either consuming the semi-finished products or if there is no on-hand then it expl...

    Read more...

    0 Comments

    Read more... 0 Comments

    Category: Production Control (520)

    STATUS DETAILS
    Needs Votes
3

New option is required to automatedly calculate the hours when user update the good quantity on route card journal

Business scenario:

Customer start the whole quantity for the production order, and the route card journal has been generated for the whole quantity. normally it takes days to completed the route card operations. and customer need to report the partially good quantity and hours daily.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Needs Votes
109

Request new material from production floor execution interface (WMS-enabled)

with the new functionality; (Preview) Register material consumption on the production floor execution interface (WMS-enabled) you can move, from the storage locations to the resource location, more quantity than requested in the BOM (for example a full pallet) and you can consume more quantity...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (520)

STATUS DETAILS
Under Review
4

on-screen keyboard Running Production Floor

Insert a numeric keyboard to enter the employee code on touch screens


The keyboard can be identical to the one used to enter the quantity to start or report progress.


form: JmgProductionFloorExecution



In this link an idea of ​​how i...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Completed
12

Recovery Cost at the Co Products or By Product

We have a use case that in our oilseed crushing business, there are multiple Co-Products and the By-Products, we allocate a recovery cost to the by-Products, which is allocated from the manufacturing cost of the Main item. So, there must be a provision in the formul...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Needs Votes
2

UOM at Resources

In Production Control, actual Units of measures are required on the resources instead of Hours.

As a use case, our production capacity is 2500 MT per day and we have the following resources to consume in one day.

1.           Electricity                                           ...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Needs Votes