10

The new MES integration feature includes the possibility to send a start signal. This start signal do not include message about route consumption, which is standard if starting from the D365 client.


The issue at the moment is that the route consumption is then controlled by the default user settings on the MES integration user. This means if parameters are pushed out as "default for all users" there is a risk that wrong settings are pushed to the MES integration user. This could happen any time and could result in that production times are pre-flushed at start by mistake. Which will result in wrong time consumption.


The idea is simply to add the route consumption to the start message to be able to be in control of how to execute the time consumption from an integration perspective.

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback. This is a great suggestion! We will consider this in our roadmap.

Sincerely,

Johan Hoffmann

PM, Microsoft