UOM at Routes


We have a use case; in our business, we have multiple products which are manufactured with different UOMs. We want to define the Routes with the UOM so that when we are creating any new product with a different UOM system can calculate the resources consumption by calculating through UOM conve...

Read more...
0 Comments

Read more...
0 Comments

Category: Production Control (493)

STATUS DETAILS
Needs Votes

UOM at Resources


In Production Control, actual Units of measures are required on the resources instead of Hours.

As a use case, our production capacity is 2500 MT per day and we have the following resources to consume in one day.

1.           Electricity                                           ...

Read more...
0 Comments

Read more...
0 Comments

Category: Production Control (493)

STATUS DETAILS
Needs Votes

Recovery Cost at the Co Products or By Product


We have a use case that in our oilseed crushing business, there are multiple Co-Products and the By-Products, we allocate a recovery cost to the by-Products, which is allocated from the manufacturing cost of the Main item. So, there must be a provision in the formul...

Read more...
0 Comments

Read more...
0 Comments

Category: Production Control (493)

STATUS DETAILS
Needs Votes