1

Add Validation to Production Order Transactions when a Project Activity is not specified but required by the Project

When creating a production order from a project and the project is setup to "REQUIRE ACTIVITY ON JOURNALS" for hours. There is a situation where the production order can post journals without validating against this required field which can cause an employee to get "stuck" working on a job in th...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (242)

STATUS DETAILS
Needs Votes
3

Adjust duration on production job based on already RAFed quantities

Make it possible to adjust duration on production job based on already RAFed quantities.For example, production order is for 500 pcs, route specified 1min/pcs.When originally scheduled, production job was for 500 mins.Then I posted job card for 5...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (242)

STATUS DETAILS
Needs Votes
8

Instructions in Job card - show attached documents of the variant

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (242)

STATUS DETAILS
Needs Votes
15

Prevent deletion of ended production orders

When a production order has the production status Ended, it is possible to delete that production order.Proposed solution: this should be allowed or restricted by a new production parameter.When a production order is in status Created, you can delete that production order, wh...

Read more...

2 Comments

Read more... 2 Comments

Category: Production Control (242)

STATUS DETAILS
Needs Votes
15

Route property check on secondary operations

Property on a route can be used to allocate resources within a calendar day to work with different kind of tasks in different time periods. Currently, production scheduling is only checking property of primary operations, when in e.g. healthcare industry it would be most beneficial to have check ...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (242)

STATUS DETAILS
Under Review
1

Configure job card terminal prompt for production area after login by employee instead of opening the form

The prompt for production area on the job card terminal configuration pops up at the wrong time. When the parameter is marked and I open the job card terminal from production control > manufacturing excecution > Job card terminal, the prompt for production area appears. Then I ...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (242)

STATUS DETAILS
Needs Votes
3

Also group by item on purchase orders generated through production subcontracting with service items

I am working in a textile company which has production subcontracted in diverse countries and we try to generate the subcontracting purchase orders. Grouping by vendor or date work great but we still miss the possibility to group by item. In our case we have different production orders by item...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (242)

STATUS DETAILS
Needs Votes
3

Data entity for Batch route operations

There is currently a data entity for Production Route Operations. From working with Microsoft, by design, this data entity is filtered to only pull PRODUCTION route information. For those of us using Batch orders, this does no good. From working with Microsoft we were told we would have to bui...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (242)

STATUS DETAILS
Needs Votes
11

Subcontracted production orders rescheduling

In the standard D365FO, when the delivery date is updated on the purchase order, the subcontracted production order is not automatically re rescheduled

Read more...

2 Comments

Read more... 2 Comments

Category: Production Control (242)

STATUS DETAILS
Needs Votes
2

When we click on JOB card device Good Quantity not updating in Log book

One operator is working at different resources at the same time (job bundling; lock employee = no). After reporting feedback on both resources and viewing the logbook, the quantities are not displayed.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (242)

STATUS DETAILS
Needs Votes