4

on-screen keyboard Running Production Floor

Insert a numeric keyboard to enter the employee code on touch screens


The keyboard can be identical to the one used to enter the quantity to start or report progress.


form: JmgProductionFloorExecution



In this link an idea of ​​how i...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (377)

STATUS DETAILS
Completed
2

Recovery Cost at the Co Products or By Product

We have a use case that in our oilseed crushing business, there are multiple Co-Products and the By-Products, we allocate a recovery cost to the by-Products, which is allocated from the manufacturing cost of the Main item. So, there must be a provision in the formul...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (377)

STATUS DETAILS
Needs Votes
2

UOM at Resources

In Production Control, actual Units of measures are required on the resources instead of Hours.

As a use case, our production capacity is 2500 MT per day and we have the following resources to consume in one day.

1.           Electricity                                           ...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (377)

STATUS DETAILS
Needs Votes
2

UOM at Routes

We have a use case; in our business, we have multiple products which are manufactured with different UOMs. We want to define the Routes with the UOM so that when we are creating any new product with a different UOM system can calculate the resources consumption by calculating through UOM conve...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (377)

STATUS DETAILS
Needs Votes
1

Correct Spanish (latin america) translation: "Route number" field for Route assignment of a production order

The translation in "es" (Spain) languaje is correct, but for some of other spanish languajes as "es-mx" it is not correct.


This field is found in Production/Batch order form, Setup section, under the Route group as "Route number". In many "es-*" is correctly translated as "Núm...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (377)

STATUS DETAILS
Planned
2023 Release Wave 1
3

Dynamic 365 Production order auto-scheduling option based on labor calendar capacities

Wish there is an option to easily allow auto-scheduling based on labor or labor type calendar capacities. in addition to standard conventional scheduling.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (377)

STATUS DETAILS
Under Review
3

Dynamics 365 Production scrap data sheet

Wish there is an option to easily generate scrap data sheet including price of sale, cost, margin, sustainable material, price per conversion, etc...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (377)

STATUS DETAILS
Needs Votes
3

Dynamics 365 Scrap target quantities

Wish there is an option to easily identify, inquiry and compare scrap target quantities, for purpose to easily forecast scrap per production order and/or per item or BOM.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (377)

STATUS DETAILS
Needs Votes
1

Dynamics 365 Production target or goal quantities

Wish there is an option to easily identify target or goal quantities, in addition to standard production planning, or scheduling.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (377)

STATUS DETAILS
Needs Votes
1

Dynamics 365 Production order BOM finished good life time spam sustainability cycle

Wish there is an option to easily identify, monitor, report BOM finished good items on life time span sustainability cycle.


Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (377)

STATUS DETAILS
Needs Votes