5

Setup time reduction between several packaging orders (filling orders)

We have different container sizes (filling orders) for each bulk item. When we start with bulk item filling, we have a greater set-up effort than if we have to change the container size. The sequence of the containers can change with every new production run, we have to assume a worst-case sce...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback.

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann 

PM,

Microsoft.

5

Add non-stocked products in BOM

For many items and across industries there is a need to specify specific items/products which are non-stocked on a BOM to make it clear that the a specific non-stocked products needs to be utilised for the specific process and/or item.


This could e.g. be a type of gas, special...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback.

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann 

PM,

Microsoft.

5

Manufacturing execution should allow production job resource rescheduling.

On occasion production jobs cannot be run on the original scheduled resource due to unforeseen issues. Requesting jobs to be rescheduled by a production planner can be a cumbersome and time-consuming process. Allowing a production worker to select a different resource from the Start job screen...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback.

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann 

PM,

Microsoft.

5

On the PFE Screen allow scrap codes to be related to Production Units and Resournces

When working with a large number of scrap codes having the ability to filter and present relevant information to the device configuration would help ensure accurate data is captured.


In some production facilities, there are big differences for scrap reasons depending on where ...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback.

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann 

PM,

Microsoft.

5

PowerApps extensibility on Production Floor Excecution app

The possibility to embed Canvas PowerApps within PFE by adding configurable tabs and/or buttons. From PFE you can add JobID or MachineID to PowerApps as input variable.


With that we can offer standard D365FO capabilities and customer Canvas PowerApps in a single UI to the shop...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback.

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann 

PM,

Microsoft.

5

From On Hand List - Related Information - View Formula

Currently when you view On Hand List > Related Information > Formula - The formula that shows up is not related to the item selected, the default shows the first formula number. It would be good to have this show the formula for the item selected on the on hand list at the time or to gray out ...

Read more...

2 Comments

Read more... 2 Comments

Category: Production Control (520)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback. This is a great suggestion!

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann

PM, Microsoft

5

Show assistants on Job Card Device and Production Floor Execution Interface

Our operators work on jobs in teams of 4. They are constantly assisting the wrong pilot, forgetting to clock in, etc. It is impossible for them to look at a screen and see if they chose the right pilot, if they logged in, etc. This whole program is built for computer savvy people to use, which...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback. This is a great suggestion!

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann

PM, Microsoft

5

Autofilter resource group in Production floor execution

We find it very useful to have the Production floor execution auto-filter with the resource group of the logging worker.

Example: I am a worker in resource group 1. When I log in to a Production floor execution terminal, the filter (form: JmgProductionFloorExecutionDeviceConfiguration an...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback. This is a great suggestion!

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann

PM, Microsoft

5

Where used in routings

We always needed a where - used look up for routings , for example this : -Show me all routing steps that have Resource or Resource group XYZ. -Show me all routing steps for Finished good item 1234 that have resource or resource group XYZ (search all subassembly routings below this finished good ...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann

PM, Microsoft

5

Automate Clock Out Worker

With a recent update, we are now able to automate the Approve and Transfer Time and Attendance Registrations that get created through the Job card terminal. The problem is, sometimes these jobs encounter errors because of workers who are missing a clock out for a given profile date. It would b...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Declined
Ideas Administrator

Thank you for your feedback. We are not considering the suggestion at this time due to the following reason: 

  • This idea has not received enough votes since it was logged.

Sincerely,

Johan Hoffmann

PM, Microsoft