6

Route scrap to consider for CW product estimation in batch order

Currently there is no option to configure scrap % for CW products neither in formula nor in route. Most of our customers having CW products which generates scrap during production. Without this option it is difficult to manage cost and child product quantity required for production. It will be re...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann
PM, Microsoft

6

Change the "accept error" functionality

This parameter "accept error" , used during Report as Finished transaction, is a questionable design. THe design should be changed. 1 it should be clear what type of error is suppresses. Some errors are indeed non-consequential and should be suppressed. (even better. the error should not even ...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback.

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann 

PM,

Microsoft.

6

Flushing principle should be considered for Planning items

Manufacturing execution using a Planning item that outputs multiple Co-products does not support flushing principle 'Finish' when reporting as finished by operation (EG: From operation = 10 and To operation = 10).
No picking lists are posted with formula lines pointing towards the specif...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (519)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Johan Hoffmann

PM, Microsoft

6

Job card device to allow user to register time on project activities

Currently job card device allows users to register time only on production orders. There are lot of scenarios where projects are used to execute a special order. In such situation user is not able to register time in project activities using job card device. Enabling project activities in...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
Completed
Ideas Administrator

Thank you for your feedback. Job card device is deprecated. We added this feature in 10.0.41 release for Production Floor Execution interface.​


Sincerely,​

Inna Kharkivska​

Software Engineer, Microsoft

5

Enabling the Lot inheritance values to be updated at the registration level not later after processing.

Lot inheritance values are updated when deferred RAF record is processed not when it is registered. 

The inventory registration process is crucial for fast-moving businesses because it allows inventory to be picked and shipped to customers quickly. Customers require deferred posting for ...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
New
5

Start multiple jobs parallel to each other in PFE

User is using PFE and is trying to start multiple jobs parallel to each other at the same time. However, he receives the following

erro...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
Completed
Ideas Administrator

Thank you for your feedback. To achive this behavior, the "Bundle" button must be used.


Sincerely,​

Inna Kharkivska​

Software Engineer, Microsoft

5

Confirmed ship date per production order

In the Production Order Overview, one is able to add the field "Confirmed Delivery Date". However, this is the date that comes from the Sales Order Header. Since we can have different confirmed delivery dates in the Sales Order Lines, it would be nice if the confirmed delivery date would come ...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
New
5

The route auto operation number is generated in descending order.

The route auto operation number is generated in descending order with different rounding sometimes every “-1”, “-5” or “-10” RANDOMLY. However, when a new operation is added, it is expected that the number generation will follow an ascending order. For instan...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
New
5

Material availability indicator in production order list and production BOM lines

Please bring material availability check from production floor management workspace to the production order list and to the production BOM lines.


Right now this very helpful feature is a bit hidden in this workspace and requires a specific date to be selected and production u...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. This is a great suggestion!

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Johan Hoffmann

PM, Microsoft

5

Setup time reduction between several packaging orders (filling orders)

We have different container sizes (filling orders) for each bulk item. When we start with bulk item filling, we have a greater set-up effort than if we have to change the container size. The sequence of the containers can change with every new production run, we have to assume a worst-case sce...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback.

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann 

PM,

Microsoft.