6

Manufacturing execution using a Planning item that outputs multiple Co-products does not support flushing principle 'Finish' when reporting as finished by operation (EG: From operation = 10 and To operation = 10).
No picking lists are posted with formula lines pointing towards the specific operation
Issue
No pickings list is posted with Automatic BOM consumption = Flushing principle due to use of planning item.


It would be great if the current layout of the system would have the same flexibility as for the Finished Good/Formula items also.


 

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Johan Hoffmann

PM, Microsoft

Comments

L

Hi Laura, interesting idea. I have used planning items a couple of times primarely for grading and sorting. Does your scenarious always include the same consumption logic regardless of which co-porduct you RAF? In my scenarious I always have 1 formula line (potato), and once I RAF out it may vary in consumption following seasonality and other factros, so a flushing is for me difficult to imagine. Let me try to understand the exact scenario. Br. Henrik

Category: Production Control