4
The route auto operation number is generated in descending order with different rounding sometimes every “-1”, “-5” or “-10” RANDOMLY. However, when a new operation is added, it is expected that the number generation will follow an ascending order. For instance, when the first operation is created with a value of 10, the second one should be 20, and so on. However, the system is currently functioning oppositely, assigning 0 to the second operation and -10 to the third.
STATUS DETAILS
New