9

MES integration - Add AutomaticRouteConsumptionRule to start message

The new MES integration feature includes the possibility to send a start signal. This start signal do not include message about route consumption, which is standard if starting from the D365 client.


The issue at the moment is that the route consumption is then controlled by t...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (362)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback. This is a great suggestion! We will consider this in our roadmap.

Sincerely,

Johan Hoffmann

PM, Microsoft 

9

Production floor execution - ability to report issues on production floor (cases)

Imagine a big production floor and something is or went wrong. For example shortage of materials / scrap materials / wrong materials delivered. It would be nice to be able to report the issue and continue working. It could be and option to use CASE MANGEMENT for that. In this way the productio...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (362)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann

Program manager, Microsoft

9

Instructions in Job card - show attached documents of the variant

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (362)

STATUS DETAILS
Needs Votes
9

Hours time field in routing operation should be restricted

The hours/time field in the routing op is a conversion factor. It is defaulting to 1. This means that the numbers in my time fields are "hours". For short run times we put in 0.0167 . Now my numbers mean "minutes". Maybe in some cases we put in "24" so now the numbers in my time fields stand f...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (362)

STATUS DETAILS
Needs Votes
Ideas Administrator

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann 

PM,

Microsoft.

9

Add a parameter setting that allows the user to choose if the picking list should register with the product being produced or with the input product financial dimensions.

Currently the financial dimensions on the production order header are defaulted to the picking list journal lines and takes precedence from any financial dimensions specified on the raw materials. If no financial dimension is on the production order header, then the financial dimension from th...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (362)

STATUS DETAILS
Declined
Ideas Administrator

Thank you for your feedback. We are not considering the suggestion at this time due to the following reason: 

The idea has not received enough votes since it was submitted 16-02-2019.

Sincerely,

Johan Hoffmann

PM, Microsoft

9

Add zoom in zoom out to gANTT chart for production

The GANTT chart for production has a timescale feature that allows you to switch from days to hours or from days to weeks etc. This is rather inefficient and not very intuitive in today's world where all graphical displays have a zoom feature. We request if we can have a zoom feature on the ch...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (362)

STATUS DETAILS
Declined
Ideas Administrator

Thank you for your feedback. We are not considering the suggestion at this time due to the following reason: 

This idea has not received enough votes since it was submitted: 

Sincerely,

Johan Hoffmann

PM, Microsoft

9

Data Entity for Production Order

Create data entity in D365ffO for Production Orders.

A partner has 2 D365ffO projects. And in both projects, Production Order integration to other system is requirement.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (362)

STATUS DETAILS
Completed
Ideas Administrator

For the fall release 2017 we have implemented Production order, Production BOM and Production Route entities. They do however come with the limitation that you can only create or update production orders in state "Created". On the export side there is no limitation. The RTW of the Fall release should happen any day.

If you need these entities on a different version than the Fall release, please create a backport request. If you need production entities that can update production order information in a different state than created, please create a new product idea for that.

Conrad Volkmann 

 

9

Workspace for shopfloor management has tile orders to release

This new tile is an excellent step forward. It shows orders to be released with their shortages. But the baked in filter seems very inappropriate.

Only orders with scheduled start today will appear. I can only check on shortages at the last minute. Customers look further ahead. They typ...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (362)

STATUS DETAILS
Declined
Ideas Administrator

Thank you for your feedback. We are not considering the suggestion at this time due to the following reason: 

It is possible to adjust the date in the date picker in the work space
There is already another idea logged that suggest to include production orders that are operations scheduled.

Sincerely,

Johan Hoffmann

PM, Microsoft

8

Production floor execution - attachment preview is small

Preview of attached file or note is small, It is thin although there is enough space to make preview higher and wider

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (362)

STATUS DETAILS
Completed
Ideas Administrator

Thank you for your feedback. We enhanced this feature so attahcments now are using the full space in the dialog in the production floor execution interface.

Sincerely,

Johan Hoffmann

PM, Microsoft

8

Make Job card terminal paper clip great again

At Job card terminal, the paper clip button, normally showing the number of attachments for the current record elsewhere is the system, always shows zero now. It shows that there are zero attachments even when there are connected attachments (to production order, operation, connected BOM lines et...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (362)

STATUS DETAILS
Needs Votes