13

Consolidated Batch Orders

Currently, the bulk item must directly exist in the packed item formula lines.  This assumes a single level formula structure.  I would like this feature extended to support phantoms - where D3fO will look to additional Formula levels to extract the bulk item.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (223)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Conrad Volkmann

PM, Microsoft

12

Remove link between Production order scheduling and picking work

We do not see the functional need for the current link between having open picking work for a production order and the ability to (re) schedule that order. It creates a big problem. If one runs a scheduling batch to make sure orders are rescheduled regularly, any open picking work makes schedulin...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (223)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Johan Hoffmann

PM, Microsoft

12

Prevent deletion of ended production orders

When a production order has the production status Ended, it is possible to delete that production order.
Proposed solution: this should be allowed or restricted by a new production parameter.

When a production order is in status Created, you can delete that production order, wh...

Read more...

2 Comments

Read more... 2 Comments

Category: Production Control (223)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Johan Hoffmann

PM, Microsoft

12

Owner dimension inheritance to production order BOM

In standard D365FO owner dimension (tracking dimension) is not defaulted to production order BOM line (like the own company owner dimension value inherits to sales order line). Thus, production picking list line is lacking owner dimension and therefore cannot be posted using backflushing (pick...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (223)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Johan Hoffmann

PM, Microsoft

12

Route Card Posting from RAF Journal

The RAF journal posting process can be set up to "backflush" the BOM lines based on the quantity reported, but you cannot post a route card journal using this process. This means that if you intend to auto post time, you must do it at "Start" which will consume all of the route time leaving no...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (223)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Conrad Volkmann

PM, Microsoft

11

Production floor execution is missing focus point on start page.

When opening the production floor execution interface there is no focus point in the start page. Meaning that if you want to clock in using a badge ID that you scan via a card, reader nothing will be read as the field isn't activated before you manually click in it.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (223)

STATUS DETAILS
Needs Votes
11

New BOM line on WO doesn´t copy measurement fields

It would be better for the user, if the measurement data was populated from the product information when added to the BOM of a specific WO. Now, if a new ítem is added to the BOM of a specific WO, measurement fields are not copied from the product information. However, if the íte...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (223)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Johan Hoffmann

PM, Microsoft

11

Mobile RaF with no Automatic BOM consumption on the Finish flushing principle

There must be an option to turn off material consumption on the mobile scanner, and let the system only backflush materials at the Job card terminal. The Mobile menu items "Report as finished and put away" and "Report as finished" must be extended for non-compulsory material consumption. This ...

Read more...

3 Comments

Read more... 3 Comments

Category: Production Control (223)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Johan Hoffmann

PM, Microsoft

11

Adding constant scrap value on a route operation

In the Route the system allows you to put a scrap percentage per operation for variable scrap which is good.  But I do not see where you can add a constant scrap value to the operation?  For instance, we have an operation that generates 1,000 feet of constant scrap regardless of orde...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (223)

STATUS DETAILS
Declined
Ideas Administrator

Thank you for your feedback. We have evaluated this Idea and declined it as there already is an option to specify constant scrap on the BOM-line. Using this option should fulfill the requirement of having a constant scrap of a material for one operation. It requires to connect the BOM-line to the operation. 

Sincerely,

Johan Hoffmann

PM, Microsoft

10

Half day for special day

For time and attendance special day, we need half day because we have employees with 4 and half day work calendar. When we have a special day we give a full day but spent on two days. As example: normal calendar is from monday to thurday 8h-17h and friday from 8h -12h. When we have a special d...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (223)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Johan Hoffmann

PM, Microsoft