2

Production corrections after Finishing Production Order

What: Make it possible to post negative output and/ or negative consumption after finishing a production order (change status to Finished) and automatically correct the cost allocation and all sorts of variances (f.e. Material or Capacity variances). Why: Sometimes people forget to register cons...

Read more...

0 Comments

Read more... 0 Comments

Category: Manufacturing (49)

STATUS DETAILS
Needs Votes
2

Production Order Statistics for FIFO

IF the item is set for FIFO costing the difference and variance should be able to be shown for Expected vs Actual instead of actual vs Standard as standard costs do not apply to FIFO items. This should be for both the Statistics page and for the report.

Read more...

0 Comments

Read more... 0 Comments

Category: Manufacturing (49)

STATUS DETAILS
Needs Votes
1

BOM and Routing by SKU

Ability to assign a default Bill of Material and Routing at the SKU level. Add fields for the production BOM and routing to the SKU card. If a production order is created for a location with a SKU, and there is a bill of material and/or routing populated on the SKU, use these values for the produ...

Read more...

0 Comments

Read more... 0 Comments

Category: Manufacturing (49)

STATUS DETAILS
Declined
1

Work Center Calendar Rounding Precision show on card page

Please add the Calendar Rounding Precision to the Work center card page and the Machine Center card page, customers use this to limit the number of decimals. It would be good if all available table fields would be on the page so the users could display what they use or need vs having to add via...

Read more...

0 Comments

Read more... 0 Comments

Category: Manufacturing (49)

STATUS DETAILS
Needs Votes
3

Planning views production orders with ILE's as Planning Flexibility NONE

There is code in the planning function that if there are any item ledger entries against a production order, planning will treat the order as planning flexibility none. The result of this is that if the demand date is before the supply date (dales order pulled in or prod order moved out) plannin...

Read more...

0 Comments

Read more... 0 Comments

Category: Manufacturing (49)

STATUS DETAILS
Needs Votes
2

Populate Demand Forecast By Sales Budget

We often get clients/prospects that want to prepare a sales forecast by customer. As we know, this can't be done with the standard demand forecasting functionality. However, we can forecast qty, sales and costs by item and by customer through the "sales budget" function. It would be great to have...

Read more...

0 Comments

Read more... 0 Comments

Category: Manufacturing (49)

STATUS DETAILS
New
2

Add features to page "Item Availability by BOM Level": "Where Used” and “Bin Content"

Hi, it would be useful to add a couple of features to the page ““Item Availability by BOM Level”, we are usually asked to add these two features: “Where Used” and “Bin Content”. Thanks Roberto Stefanetti

Read more...

0 Comments

Read more... 0 Comments

Category: Manufacturing (49)

STATUS DETAILS
Needs Votes
1

Zero consumption in Manufacturing Setup

Allow for the option in Manufacturing Setup for consumption to default to all zeroes vs. what the BOM suggests. This currently exists already in Manufacturing Setup for setting Outputs.

Read more...

1 Comments

Read more... 1 Comments

Category: Manufacturing (49)

STATUS DETAILS
New
1

Production Journal Save After Leaving Page/Allow for Approval on Prod. Journal

This is a two part idea as one is required for the other. Currently, when you enter information without posting on the Production Journal, and if you leave the page, then all data will be removed if not posted. Allow this to be saved so user can come back and post later. This would then allow th...

Read more...

0 Comments

Read more... 0 Comments

Category: Manufacturing (49)

STATUS DETAILS
Needs Votes
2

Back flush Capacities at Output vs Finish

A common modification we do for customers it to back-flush "standard" labor at output vs when the order is finished. By doing this the capacity entries are created as production is done and there is not a variance until the order is finished like you have in stock BC. This tends to make accounti...

Read more...

0 Comments

Read more... 0 Comments

Category: Manufacturing (49)

STATUS DETAILS
Needs Votes