Stop consumption journal postings to unrelated production orders
Hi all, hope that you're having a good day!
I have found that it is possible to wrongly designate consumption (or negative consumption/positive item adjustment) on a completely unrelated production order whose item is not related to the consumption item being posted in any way...
Allow Planning Worksheet to reschedule production orders with lots assigned
The current code in the planning worksheet calculation will set the planning flexibility to None if you assign a lot to the production order line to be used when the order is released and you output to it.
So instead of telling the user to reschedule to an earlier date the c...
Manual reservations from planning worksheet
For planning needs and following the existing button on planning worksheet "reserve". It would be usefull to make possible the reservation of items from planning worksheet in orther to supply determined sales or projects, keeping dates coordination.
System can make reservatio...
Production Order Start Date always the lowest Start Date of the Prod. Order Line
When a Production Order is created from the Sales Order with an multi level Production BOM the Starting Date of the Production Order is based on the main Production BOM/Item. In my opinion this should always be the lowest Prod. Order Line it's Starting Date.
Reservations in Buciness Central
I have a problem with reserves. I have configured items to be reserved, trying to set them up as reserve= optional or always.
I have tested the issue with items with reorder policy = order or lote-by lot. I have encountered the same problem.
When I'm using p...
Enhancements to Standard Cost Worksheet – Support for Stockkeeping Units
1. Objective
Enhance the existing Standard Cost Worksheet functionality in Dynamics 365 Business Central to support Stockkeeping Units (SKUs) in all relevant standard cost calculation and implementation processes.
...
Improve new over-pick functionality to take into account overpicks when creating subsequent picks
The new over-pick functionality added in BC26 was much needed and long-awaited although it does not cover a key and important scenario which would be the most common usage.
Currently over-picks are designed purely to allow to over-pick a component in the case you may consume m...
Add labor and its cost as resource to production orders
We have multiple customers who would like to add human labor into production orders as time and cost, separately from machine costs, and add resources to production orders similarly to how it is done in assembly orders. Or not necessarily the same, but something similar.
Examp...
Overpicking with item tracking
The new functionality "Enable overpicking for production order" does not work with a tracked item (error message when registering pick suggesting to adjust the existing item tracking specification).
It could be very interesting to be able to overpick item that has an item tracking code.
Automatically updated calendar entries for selected lines on page Registered Absences
On page Registered Absences (99000920, List) for function "Implement Registered Absence" (R:99003801) add a new Boolean field "updated entries" that will automatically updated calendar entries for selected line...