3

Ability to report as finished operation on mobile device

Currently the Report as finished menu option for the mobile device only allows reporting the entire production or batch order as finished. It would be desirable to allow the users to report a single or multiple operations as finished on the mobile device instead of having to use the D365 terminal.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (223)

STATUS DETAILS
Needs Votes
6

Allow users to see Materials used for each operation on Job Card Device

Unlike the Job card terminal, users cannot see which/how much materials they have to use/consume on the Job card device. Having the materials defined per operation would be great in the combination with Description/Instruction on the Job card device.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (223)

STATUS DETAILS
Needs Votes
5

Automate Clock Out Worker

With a recent update, we are now able to automate the Approve and Transfer Time and Attendance Registrations that get created through the Job card terminal. The problem is, sometimes these jobs encounter errors because of workers who are missing a clock out for a given profile date. It would b...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (223)

STATUS DETAILS
Needs Votes
12

Remove link between Production order scheduling and picking work

We do not see the functional need for the current link between having open picking work for a production order and the ability to (re) schedule that order. It creates a big problem. If one runs a scheduling batch to make sure orders are rescheduled regularly, any open picking work makes schedulin...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (223)

STATUS DETAILS
Needs Votes
3

No Production order displayed in Marking form

Description of problem:
- Customer is having a production orders which would like to manually mark together
o Level n° 1 = CPR36-016
o Level n° 2 = NOY36-016
Which are having several open (and available – not reserved or marked against anything else) batch ord...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (223)

STATUS DETAILS
Needs Votes
8

Prod order shortage screen

The "prod orders to release" that indicates material shortages with yellow triangle is unusable and needs to be drastically changed: -remove any prefilter on having a production unit on your resource group. This is optional functionality. THe system works fine without production units and it make...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (223)

STATUS DETAILS
Under Review
2

Timing of validation should be while line is added and not during re-estimation

fter a Production order is created if we add a Phantom item when that item does not have a valid BOM, the system throws error while re-estimation. Ideally it should throw error while the line is being added.

Repro steps:
1.I create a Production order

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (223)

STATUS DETAILS
Needs Votes
4

Continuous BOM consumption

In a lot of cases/industries the usage of raw material during a route is not at start nor at finish of a route operation but has a continuous input/material usage. As Dynamics does not have an option to split this usage for example per day, hour or other definable period our purchase Master Pl...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (223)

STATUS DETAILS
Under Review
4

Extend decimal precision in the Times field on an operation and resource

The 'Times' field when entering 1/60 rounds to a 4 decimal precision. This makes the result .0167. When applying this result to the time on a production order the extended value is 'off' from the expected value. For example:

15 minutes = .25 hours, BUT
in D365 15 minutes = .250...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (223)

STATUS DETAILS
Under Review
1

Production Floor Management - Fix Jobs with Deviation Calculation

When new resource group membership records are created and the old membership becomes expired, the jobs with deviation calculation doesn't work correctly. Issue was submitted to Microsoft and the response was the calculation by design was not excluding the expired resource group membership record...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (223)

STATUS DETAILS
Completed