Dynamics 365 TMEC Production order certificate of origin at point of customer sales order
Wish there is an option to easily generate TMEC certificate of origin and easily email and/or print with number sequence at point of customer sales order or sales order billing.
Not featuring a TMEC production certificate of origin, user may potentially process conventionally ...
When canceling an item, despite specifying a license plate, the system does not select the correct one on Production floor execution
The issue is that if a user books an incorrect quantity of an item (Report progress on PFE), when we want to cancel that booking via Report progress on PFE the system takes the wrong license plate. So basically the user which is working directly in the production via production floor execution...
Bulk production orders "End" facility
Hi
My Self Amit Wagh
Phone No 9822574919
Email id amitwagh2596@gmail.com
We are very keenly awaiting the facility of bulk selection of Production orders in the module of Production control and Rout cards in a single click.
Regards,
...
Production Floor Execution Product Dimensions
Production Floor Execution does not include separate fields for the product dimensions. Many manufacturers like to sort and\or filter on product dimensions, particularly color. It would be nice to have the product dimensions like every other field within the rich client.
Left/Right navigation on new grid control does not perform as expected
Actual Result: Since upgrade to PU53, customer is not able to use left/right arrow to scroll horizontally in the grid on the forms. Also, when the data list is greater than the display window it is shown in, Customer is required to use SHIFT Key Along with Mouse Scroll to scroll horizontally i...
PFE: Leave button divided into clock-out and blocked.
Leave button divided into clock-out and blocked.
Change the Leave button for 2 buttons:
Use Manufacturing Execution/Production Floor Execution without posting actual time
Production floor execution (PFE) is a great interface for operators to report progress and consumed material on operations. However, in many occasions it is not wished to capture actual time spent (actually this requirement has been a reality in basically all my projects, at least for some rou...
Dans production floor execution, blocage en cas de quantité eronnée et tolérance à 0
Pour certaines typologie de production, la quantité mise au rebut ne doit pas être intégrée dans la quantité de référence lors de contrôle de la quantité produite. Donc, si nous déclarons une quantité erronée , nous sommes bloqués systé...
Link operations secondary to primary to register the time and cost of several resources on PFE
Business Case:
The production route has 2 or more resources, for example: a machine, a mold and an operator. the 3 resources must add costs to the order, each mold, each machine and each person have a different cost category
Dynamics 365 Production scrap quantities inter-company purchase order and sales order auto-creation
Wish there is an option to easily process an inter-company sales order with purchase order for scrap quantities as specified from a production order.
Not featuring intracompany orders, user may potentially process conventionally from a sales order and/or from a purchase order,...