3

Ability to recalculate BOM level based on the formula master if there is a production order which includes a circularity BOM

Request to have an ability to recalculate BOM level based on the formula master if there is a production order which includes a circularity BOM. <p style="m...

Read more...

2 Comments

Read more... 2 Comments

Category: Production Control (252)

STATUS DETAILS
Needs Votes
8

Item substitution and backflushing

When a formula item is substituted for another - the system grabs quantities based on available on-hand inventory. Ex - ItemA - 150, ItemB (sub)&nbsp;- 50 When backflushing the components, both are posted each time in the same proportion as they were on ProdBOM. Ex - ItemA...

Read more...

2 Comments

Read more... 2 Comments

Category: Production Control (252)

STATUS DETAILS
Needs Votes
2

Incorrect Production Order BOM line is added to unrelated Production Order BOM

There is an issue that Incorrect Production Order BOM line is added to unrelated Production Order BOM.Because the ProdTableListPage form doesn't have link to the prodBom to call linkActive method of Forms\ProdBOM\Data Sources\ProdBOM\Methods\linkActive. it's only call the linkActive whic...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (252)

STATUS DETAILS
Declined
5

Consolidated batch orders with more than 1 level

There is a main formula than contains a packed item which has a bulk item linked to it. When using the Firm consolidated batch orders form, it only shows the packed and the bulk items but nothing about the main formula. Customer needs to firm from the main formula to the next levels (which usu...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (252)

STATUS DETAILS
Declined
13

Consolidated Batch Orders

Currently, the bulk item must directly exist in the packed item formula lines. &nbsp;This assumes a single level formula structure. &nbsp;I would like this feature extended to support phantoms - where D3fO will look to additional Formula levels to extract the bulk item.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (252)

STATUS DETAILS
Under Review
29

Porduction Order estimation - Take sub-contracting value from Purchase

The current estimation process takes the cost of sub-contracting items from the manage cost tab of the released product card. In scenarios where the sub-contracting cost fluctuates significantly from one production order to another this feature becomes non-manageable. It would be more s...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (252)

STATUS DETAILS
Under Review
2

Promote Queue times on Routings for Gantt chart and WIP mgt

I really like what&nbsp;the Microsoft team&nbsp;have done with the Gantt chart. One addition would just make it for me: adding Adjust Queue Before and Adjust Queue After to this list of right click options to reconcile oper...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (252)

STATUS DETAILS
Needs Votes
6

Job card device to allow user to register time on project activities

Currently job card device allows users to register time only on production orders. There are lot of scenarios where projects are used to execute a special order. In such situation user is not able to register time in project activities using job card device.&nbsp;Enabling project activities in...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (252)

STATUS DETAILS
Needs Votes
12

Route Card Posting from RAF Journal

The RAF journal posting process can be set up to "backflush" the BOM lines based on the quantity reported, but you cannot post a route card journal using this process. This means that if you intend to auto post time, you must do it at "Start" which will consume all of the route time leaving no...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (252)

STATUS DETAILS
Under Review
2

Partial Cost Calculation for Discrete Manufacturing

&nbsp;Is it possible to post financially one part of the production order? (Advisory Issue)Here is the scenario:- I have a production order that will be finished as 2 parts. One part will be finished in June 2017, other part will be finished in July 2017. I would like t...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (252)

STATUS DETAILS
Needs Votes