User Profile

Independent operations on route


If there are routes with several differentiated operations (10, 20, 30, 40, etc) with link type strogn between them, it is not possible that, for example, operation 20 and 40 are the same type of work (for example, polishing) since it is not possible to assign the same operation code and have ...

Read more...
1 Comments

Read more...
1 Comments

Category: Production Control (456)

STATUS DETAILS
Needs Votes