Independent operations on route
If there are routes with several differentiated operations (10, 20, 30, 40, etc) with link type strogn between them, it is not possible that, for example, operation 20 and 40 are the same type of work (for example, polishing) since it is not possible to assign the same operation code and have ...
STATUS DETAILS
Under Review