11

Subcontracted production orders rescheduling

In the standard D365FO, when the delivery date is updated on the purchase order, the subcontracted production order is not automatically re rescheduled

Read more...

2 Comments

Read more... 2 Comments

Category: Production Control (235)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Johan Hoffmann

PM, Microsoft

11

New BOM line on WO doesn´t copy measurement fields

It would be better for the user, if the measurement data was populated from the product information when added to the BOM of a specific WO. Now, if a new ítem is added to the BOM of a specific WO, measurement fields are not copied from the product information. However, if the íte...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (235)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Johan Hoffmann

PM, Microsoft

11

Mobile RaF with no Automatic BOM consumption on the Finish flushing principle

There must be an option to turn off material consumption on the mobile scanner, and let the system only backflush materials at the Job card terminal. The Mobile menu items "Report as finished and put away" and "Report as finished" must be extended for non-compulsory material consumption. This ...

Read more...

3 Comments

Read more... 3 Comments

Category: Production Control (235)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Johan Hoffmann

PM, Microsoft

11

Adding constant scrap value on a route operation

In the Route the system allows you to put a scrap percentage per operation for variable scrap which is good.  But I do not see where you can add a constant scrap value to the operation?  For instance, we have an operation that generates 1,000 feet of constant scrap regardless of orde...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (235)

STATUS DETAILS
Declined
Ideas Administrator

Thank you for your feedback. We have evaluated this Idea and declined it as there already is an option to specify constant scrap on the BOM-line. Using this option should fulfill the requirement of having a constant scrap of a material for one operation. It requires to connect the BOM-line to the operation. 

Sincerely,

Johan Hoffmann

PM, Microsoft

10

Half day for special day

For time and attendance special day, we need half day because we have employees with 4 and half day work calendar. When we have a special day we give a full day but spent on two days. As example: normal calendar is from monday to thurday 8h-17h and friday from 8h -12h. When we have a special d...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (235)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Johan Hoffmann

PM, Microsoft

10

Job card device -- needs assistant functionality

The new Job card device in MFG execution is a winner but it is missing quite a few things the old operator terminal had.

One of them is the "assistant" function. Two people working on the same job together.

Although the job card device SEEMS to support it, because two names show ...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (235)

STATUS DETAILS
Declined
Ideas Administrator

Thank you for reaching out. Your suggestion seems to be a duplicate of the following suggestion:

https://ideas.dynamics.com/ideas/dynamics-operations/ID0001322

Please add your valuable votes and comments to the suggestion above instead.

Regards,

Johan Hoffmann

 PM, Microsoft

 

 

 

 

 

 

 

10

Orders to release - shortage information

THe shortage screen (yellow triangle screen) for prod orders is a success but it could use some enhancements in the bottom.

- when a component of the Prod BOM is not on hand, but there is an order on the way, we would like to see that order number and the day it is going to arrive. This...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (235)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Conrad Volkmann

PM, Microsoft

10

Prod order. please prevent double backflushing

It is very easy to make a mistake and cause a double backflush of the prod order materials. the system does not give a beep.

The Prod BOM Components have an estimated and a released quantity.

Certainly we should be able to over issue so released qty is higher than estimate. But t...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (235)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Conrad Volkmann

PM, Microsoft

9

Remove restrictions for COPY BOM and COPY ROUTE for Production orders

The COPY option for Prod BOM and Prod Route is important functionality. It is however close to unusuable because of the unreasonable restrictions on order status. It is very real life to have the need for COPY BOM or COPY ROUTE when the prod order is in estimated status or scheduled status. The ...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (235)

STATUS DETAILS
New
9

Hours time field in routing operation should be restricted

The hours/time field in the routing op is a conversion factor. It is defaulting to 1. This means that the numbers in my time fields are "hours". For short run times we put in 0.0167 . Now my numbers mean "minutes". Maybe in some cases we put in "24" so now the numbers in my time fields stand f...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (235)

STATUS DETAILS
Needs Votes
Ideas Administrator

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann 

PM,

Microsoft.