30

Remove link between Production order scheduling and picking work

We do not see the functional need for the current link between having open picking work for a production order and the ability to (re) schedule that order. It creates a big problem. If one runs a scheduling batch to make sure orders are rescheduled regularly, any open picking work makes schedulin...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (362)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback.

This is a great suggestion! We will consider this in our roadmap.

Sincerely,

Johan Hoffmann, Program Manager

Microsoft.

30

Retrieve the "finished items in process" report as known from earlier AX versions

The report "Finished items in process" was part of AX 2012 alongside with it's companions "Materials in process", "Work in process" and "Indirect costs in process". The latest three mentioned are still present in Dynamics 365, but the "Finished items in process" report is gone. It would be ver...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (362)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback.

This is a great suggestion! We will consider this in our roadmap.

Sincerely,

Johan Hoffmann, Program Manager

Microsoft.

28

Use Manufacturing Execution/Production Floor Execution without posting actual time

Production floor execution (PFE) is a great interface for operators to report progress and consumed material on operations. However, in many occasions it is not wished to capture actual time spent (actually this requirement has been a reality in basically all my projects, at least for some rou...

Read more...

3 Comments

Read more... 3 Comments

Category: Production Control (362)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback. This is a great suggestion!

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann

PM, Microsoft

27

Time and Attendance profile date on Clock out worker batch job

Clock out worker batch job can only be run on the fixed profile date set on the parameter. This does not make sense for the batch job, which is supposed to clock out worker on the day the batch job is run. Idea: Please have a "dynamic" profile date on the clock out worker batch job so that the ...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (362)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback.

This is a great suggestion! We will consider this in our roadmap.

Sincerely,

Johan Hoffmann, Program Manager

Microsoft.

27

CLose the loophole for Prod orders and RAF on the handheld

This is a rather serious flaw that needs to be addressed. We know that you can create and process a production order all the way without having a BOM. So you can make something out of nothing. Not sure whether I would allow that if it were my ERP system but we have accepted that for years. Now...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (362)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback. This is a great suggestion! We will consider this in our roadmap.

 

Sincerely,

Johan Hoffmann

PM, Microsoft 

 

26

Post picking list with option "Transfer all posting errors to a new journal" which includes posting errors

We are trying to post all picking lines that can be posted (lines without errors) and to transfer all lines with errors to new journal. System will create new journal and transfer error lines only if those errors are on the line level (validation of journal lines is not OK). If there is posting e...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (362)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback.

This is a great suggestion! We will consider this in our roadmap.

Sincerely,

Johan Hoffmann, Program Manager

Microsoft.

26

Print produced item information label

When creating a new item in the production order, the system should be able to generate a label containing the item/serial/batch information for the produced item. This has to be an integrated part of the production process as the serial number needs to be put on the produced part during produ...

Read more...

2 Comments

Read more... 2 Comments

Category: Production Control (362)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback.

This is a great suggestion! We will consider this in our roadmap.

Sincerely,

Johan Hoffmann, Program Manager

Microsoft.

25

Production Floor management release net requirements

Make it possible to go directly to Net Requirements from the Release to Production order form in Production Floor Management Workspace.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (362)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Conrad Volkmann

PM, Microsoft

23

Over production should reflected in started and remaining quantity

Currently there are 2 scenarios in production control > production floor execution which should be user configurable options according to below expectations:


  1. Over production should be reflected in started and remaining quantity - When the quantity gets ov...

    Read more...

    0 Comments

    Read more... 0 Comments

    Category: Production Control (362)

    STATUS DETAILS
    Under Review
    Ideas Administrator

    Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

    Sincerely,

    Johan Hoffmann

    PM, Microsoft
23

Partial release of production order quantity

Basically D365 offers a solution for a partial release of production order quantities (Release on PO > General tab > released quantity). The field description is as follows: Use this option to release raw materials for a partial quantity of the production or batch order quantity. For example, for...

Read more...

2 Comments

Read more... 2 Comments

Category: Production Control (362)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback. We would like to get a better understanding of the business impact you are here seeing. Can you provide some elaboration?

Sincerely,


Johan Hoffmann

PM, Microsoft