Please align fields as in all prev. AX versions
The customer is facing an issue with the field groups in Dynamics/Dynamics 365 Supply Chain Management/Manufacturing and production/Issues with production and batch orders. They want the fields to be aligned as in all previous AX versions
Generate packaging labels at Work/Production Order Start
Current D365 SCM functionality enables labels to be printed when a quantity of finished goods are reported as finished on a Work/Production Order.
For some manufacturing processes where multiple boxes of finished goods will be made this restricts the ability to label the boxes...
Thank you for your feedback.
Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.
Sincerely,
Johan Hoffmann
PM,
Microsoft.
Attached instructional videos can play in Shop Floor Control device.
You can add various attachments that appear in "Instructions" when a user is tracking production activity on the production floor execution device. Being able to play videos directly in the console would be beneficial and could provide additional training assets directly where needed.
Thank you for your feedback.
Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.
Sincerely,
Johan Hoffmann
PM,
Microsoft.
PowerApps extensibility on Production Floor Excecution app
The possibility to embed Canvas PowerApps within PFE by adding configurable tabs and/or buttons. From PFE you can add JobID or MachineID to PowerApps as input variable.
With that we can offer standard D365FO capabilities and customer Canvas PowerApps in a single UI to the shop...
Thank you for your feedback.
Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.
Sincerely,
Johan Hoffmann
PM,
Microsoft.
Production Floor Execution Product Dimensions
Production Floor Execution does not include separate fields for the product dimensions. Many manufacturers like to sort and\or filter on product dimensions, particularly color. It would be nice to have the product dimensions like every other field within the rich client.
Thank you for your feedback. This is a great suggestion!
Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.
Sincerely,
Johan Hoffmann
PM, Microsoft
on-screen keyboard Running Production Floor
Insert a numeric keyboard to enter the employee code on touch screens
The keyboard can be identical to the one used to enter the quantity to start or report progress.
form: JmgProductionFloorExecution
In this link an idea of ​​how i...
Thank you for your feedback. We released this feature as part of the functionality in release 10.0.31.
Here is how to enable the feature and get the numpad shown in the sign page for the Production floor execution interface:
- Go to feature management and enable feature: Enable use of a numpad in the sign-in page
- Go to page Configure production floor execution and enable parameter: Enable numpad
Sincerely,
Johan Hoffmann
PM, Microsoft
Display late jobs in a different color in Gantt chart
The Dynamics 365 SCM Gantt chart currently don't support a different color for late jobs It works in AX 2012 R3
Resource field in the Prod Route should be repopulated
The grid screen for the PRoduction route shows the resource that was used for the scheduling of the prod order. When an operation is completed, that field is cleared. Nobody knows why that is and it confuses the user. But it has been that way from the very first version of AX. 1 year ago a new fe...
Timing of validation should be while line is added and not during re-estimation
Repro steps:
1.I create a Production order
Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.
Sincerely,
Johan Hoffmann
PM, Microsoft
Continuous BOM consumption
In a lot of cases/industries the usage of raw material during a route is not at start nor at finish of a route operation but has a continuous input/material usage. As Dynamics does not have an option to split this usage for example per day, hour or other definable period our purchase Master Pl...
Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.
Sincerely,
Johan Hoffmann
PM, Microsoft
Administrator
Thank you for your feedback.
Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.
Sincerely,
Johan Hoffmann
PM,
Microsoft.