8

Surplus for manufacturing in the client, manufacturing execution app and warehouse management app is not working. only the shortage percentage is working.

Over production is not supported in D365 unless "accept error" is enabled.


Error message will always be thrown unless the accept error is enabled, however, for shortage, it works fine.


The issue was found before in AX2012 where "Accept Error" was added as a fi...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
New
8

Re-schedule production order after update route resource quantity, resource is not assigned to the updated jobs, need user manual click job update on production all jobs form and then re-schedule the production order

After the production order job is started, user want to increase other route resource quantity, and then update the route and reschedule the production order. Resources are not assigned to the updated jobs. Only users cli...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
New
8

Job scheduling limitations based on Date range (scheduling by day(s) range) by Operational level on Route

Current D365 job scheduling allows the Scheduling team to schedule jobs backward for a delivery date to prevent them from extending the scheduled production jobs into the follow date. This is a means of preventing Jobs that have processes which must be completed in a singular day (possibly due...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback.

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann 

PM,

Microsoft.

8

Sorting of indirect activities

Currently, indirect activities are sorted on the Production floor execution according to there Job-ID. However, it can happen that after a while an additional indirect activity is created, which should be after a similar indirect activity. Therefore it would be helpful if you could add a rang-...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback.

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann 

PM,

Microsoft.

8

QM: Route operation quality associations for planning item

If is used Route operation quality associations for Co-Products defined in planning item formula version, system not creating quality order.


Issue Definition:

For this case, I understand you have...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback.

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann 

PM,

Microsoft.

8

The setup time and the run time for secondary operations are considering the load.

The setup time and the run time from secondary operations are considering the load.


When you define a load on the secondary operation, both time (setup and run time) are considering the load during estimation. That means the calculated setup time and the calcu...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback.

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann 

PM,

Microsoft.

8

Functionality to reverse the Production Order (the one ended by mistake)

There should be an option to reverse the end of Production.

In many cases, due to human error, by mistake the Production Order get ended by the user. In such cases it is lot of work that has to be done again, such as:


  • Create new items for N Raw materials (N items) a...

    Read more...

    0 Comments

    Read more... 0 Comments

    Category: Production Control (519)

    STATUS DETAILS
    Declined
    Ideas Administrator

    Thank you for your feedback. We are not considering the suggestion at this time.

    Sincerely,

    Johan Hoffmann

    PM, Microsoft

8

System should prevent workers in PFE from clocking in or starting jobs when the worker's registrations have been Transferred.

The issue, "When starting jobs on the Job card device, the Started quantity is not updated when jobs are being started after registrations have been transferred"

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann

PM, Microsoft

8

Production floor execution - attachment preview is small

Preview of attached file or note is small, It is thin although there is enough space to make preview higher and wider

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (519)

STATUS DETAILS
Completed
Ideas Administrator

Thank you for your feedback. We enhanced this feature so attahcments now are using the full space in the dialog in the production floor execution interface.

Sincerely,

Johan Hoffmann

PM, Microsoft

8

Auto create License plate

Hi, My most of the clients want to Auto create the new license plate while posting Report as finished in D365 F&O

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Johan Hoffmann