User Profile

Route new line insert issue


Scenario-1 Adding a line of route from the item master (Expected behavior in Route master and Item Route)


When we are adding a line from the item master new line will be added in a downward direction or when we press the downward arrow key new line added on th...

Read more...
0 Comments

Read more...
0 Comments

Category: User Experience (440)

STATUS DETAILS
New

The setup time and the run time for secondary operations are considering the load.


The setup time and the run time from secondary operations are considering the load.


When you define a load on the secondary operation, both time (setup and run time) are considering the load during estimation. That means the calculated setup time and the calcu...

Read more...
0 Comments

Read more...
0 Comments

Category: Production Control (456)

STATUS DETAILS
Needs Votes