When using Production Floor Execution, Secondary realized cost amount is not realized and stuck on Estimated.
When the primary operation is started the secondary operations are shown in stopped status. (This is okay)
But when you report a quantity on the primary operation the hours for that quantity is not applied to the secondary operations, which hold the cost categories. So no cost for the la...
Cannot save filtered view in production floor execution interface.
After filtering the columns in the production floor execution interface and saving it as a view, the filtered value disappears upon leaving or refreshing the form.
Despite being previously identified as a By-Design issue (857459), clients who are unable to filter and sort thei...
Place holder for Potency Management Extension
Power App Development for Potency calculation
Visibility for operator in PFE to view reported progress for operation(s) with multiple resources
When a production operation is job scheduled and has multiple resources assigned [Resource load fast tab > Quantity greater than 1] and the job is released to production floor the operator is shown the full production quantity instead of calculated split quantity per job based on the number of...
MES Integration - add Site and Warehouse to message headers and Manufacturing execution system integration form
Companies with several sites/warehouses doing manufacturing with an MES will be sending various messages from/to D365. The message headers only include a production order number, therefore if the person responsible for manufacturing in warehouse A wishes to check the status of the messages for...
Enable reservation in Producton control parameters per site
Production control parameters by site is vital for companies that run various production processes in different sites.
One site might need reservation at a different step than another site. Especially if one site is running WMS and another site is not.
However, the reser...
Quality order generation based on a time interval
Currently there is no functionality to have a quality order automatically generated based on a time interval i.e. have a quality order automatically generated every x number of hours against a production order which is in progress.
This functionality would allow a person who i...
Using KANBAN rules for raw materials replenishment in production when items are weighted average cost controlled
I'm creating this idea on behalf of my customer Delaware.
Customer is using KANBAN for their raw material replenishment in production. However, the items produced are weighted average cost controlled, hence once she uses the kanban rule, the system triggers th...
The possibility to select Buyer group / Production pool / Coverage groups in the setup form in Explosion on the planned production orders.
On planned production orders the planner needs more information in the Explosion form to be able to determine how the line should be handled.
We need to add the extra options here s...