When the subcontract production is scheduled with finite material purchase order work flow should be submitted only once

When the subcon production is scheduled with finite material enabled check mark, purchase order work flow should submit only once. As of now it is submitting multiple times which is taking time and users are also not happy with multiple approvals

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (457)

STATUS DETAILS
Needs Votes
1

Improve the unpick process for prod orders

When you unpick items on a Production order, the functionality is insufficient and not quite thought through. it asks you no question. After the unpick the item is located in the INPUT location of the Resource group. This means it is not truly available for a next pick. When the user is ready ...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (457)

STATUS DETAILS
Needs Votes
65

Job card terminal,check attachments on job for the production oder. the attachments from the BOM line is not shown

In standard D365 attachments from the following levels are shown on the job in the job card terminal:Production itemBOM headerRoute headerRoute operationProduction orderProduction BOM lineProduction Route operationwhy are attachments from the BOM lines not shown. this seems Obvious and neces...

Read more...

2 Comments

Read more... 2 Comments

Category: Production Control (457)

STATUS DETAILS
Under Review
38

Planning production orders setup for several production orders running in multi shifts

With advanced multi-functional work center machine in production companies, you get more and more the following scenario to cover the work center planning. Example: Work center runs in 3 shifts. Shift 1 and 2 are under control by production people. 3 shift in the night is a ghost shift. This m...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (457)

STATUS DETAILS
Under Review
2

Warning messages when set up for subcontracting not complete

Subcontracted routing operations need to be completed. One can do this manually but much more convenient is to use the parameter in prod control or subcontract PO's. Upon receiving of such a PO, the subcon operation can be completed using a special route group. This set up is pretty subtle and...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (457)

STATUS DETAILS
Needs Votes
8

Formula Batch Attribute inheritance for mutiple batches consumed in Batch Order

A formula for a finished good is set to inherit the values from a raw material's consumed batch (es). If there is more than one batch consumed in a production batch, the system ignores the values of the other batches' attributes that are consumed and only transfers the values of the first batc...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (457)

STATUS DETAILS
Needs Votes
5

No set up job and process JOB Id's please when there is zero time

When I schedule a prod order, the system generates setup job and process job id's for every set up and run time on every operation even is the time on these is ZERO . When you , by mistake, scan one of those you get "job not found". This makes no sense. A routing setup of zero time should wast...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (457)

STATUS DETAILS
Needs Votes
11

Use the job card device without the whole time and attendance functionality

Some businesses want to use the job card device basically as a tool to execute and track real-time production and provide instructions and guidance to the floor. They may not have the need to control time and attendance of production workers at all. Sometimes they'd like to but they are not st...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (457)

STATUS DETAILS
Declined
2

Missing entities for uploading manufacturing execution

Following tables cannot be uploaded with data management as no data entities exist: JmgIpcActivity and JmgIpcCategory (Indirect activity categories). It means you cannot copy them into a second legal entity if you have a second manufacturing plant for example. Also for creating golden configur...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (457)

STATUS DETAILS
Completed
6

Reset status of a subcontracting production order when purchase order confirmed.

Using subcontracting in Dynimics is a little bit harsh. My case is: Subcontracting work > Creating a production order > Estimate the production order > Scheduling the production order > Confirming the purchase order of the subcontracting work > after that resetting the status of...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (457)

STATUS DETAILS
Needs Votes
  • 1