19

Flushing of rawmaterial when co-products are being reported as finished

In the proces industry we are working with the planning item, where all output is being reported as co-products. Now and then, we need to auto-report consumption og cartons, etc. This is not supported as of now. According to product group this is a product limitation as the problem is that the...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (252)

STATUS DETAILS
Under Review
4

Add parameter to Mfg execution prod order defaults

1.The "backflush BOM materials at start": parameter = yes and I am using advanced warehousing. I am also having multiple picking rounds for one prod order because not all materials are always there at the start. I want to pick and then backflush what I have and pick and backflush the rest late...

Read more...

3 Comments

Read more... 3 Comments

Category: Production Control (252)

STATUS DETAILS
Needs Votes
7

change parameter "Defer updates of cost calculation until production order reaches ended status"

If I understand the Parameter correct: The parameter prevents the cost calculation until the production order is ended (and there is no way to correct it again). In my opinion, it would be helpful to skip it until the production is reported as finished. In that case you have a chance to make c...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (252)

STATUS DETAILS
Needs Votes
46

Report scrap quantity from mobile device

It would be great advantage to be able to not only report a good quantity as finished with the mobile device menu items "Report as finish" and "Report as finish and put away", but also be able to report a scrap quantity at the same time. The handling/posting of the material for the scrap quant...

Read more...

3 Comments

Read more... 3 Comments

Category: Production Control (252)

STATUS DETAILS
Under Review
8

Consolidated Batch Orders should be able to have capacity reservations.

In process manufacturing there is frequently a structure of:   Bulk Batch product RFBulk - Radiator Fluid Packed Batch product RF1- 1 Gallon Radiator Fluid Packed Batch product RF5 - 5 Gallon Radiator Fluid Packed batch product RF55 - 5...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (252)

STATUS DETAILS
Needs Votes
16

Allow RAF even if picking list fails (backflush)

Allow RAF even if picking list fails (backflush) Business case: Customer don't allow production output to stop due to issues with material consumption of back flushed material Issue with current support: Report as finished fails if picking list journal (backflu...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (252)

STATUS DETAILS
Under Review
32

Overproduction with raw material used frequently on the production line

Overproduction with raw material used frequently on the production line Business scenario: Customer don't know the output from production orders upfront (it varies), ie they calculate with 50 kg of finished goods (production order quantity), but in the end...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (252)

STATUS DETAILS
Under Review
10

Be able to reverse LP from co-products.

In the process industry we are working a lot with co-products. Even in the scenario of using a planning item – everything that you RAF is by default co-products – and here we would from time to time need to revert them. In previous releases it became possible t...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (252)

STATUS DETAILS
Under Review
57

Print BOM information option when releasing production orders.

Some of the manufacturing companies require the possibility to print BOM information when releasing production orders, similarly as route card information can be printed. After printing on paper, this documentation is then sent to production floor. The production BOM will provide an overview o...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (252)

STATUS DETAILS
Under Review
15

Raw material retrieval to line

In the process industry we often see, that the raw-matarial consumption various due to yield and mixed dosing between raw material line A and B. It means that during production, the shopfloor worker, realized that he/she needs more raw-material of item A, to fulfill the production quantity.</p...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (252)

STATUS DETAILS
Under Review