3

Workspace production floor management

This workspace has all prod jobs lined up in the middle. It is however bad news to find out that none of these jobs show any dates. One has to personalize but that is not enough. the production order delivery date is an absolute must in this screen. Without that the user has no idea what the d...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (237)

STATUS DETAILS
Declined
81

Enable the material availability check for production orders that are operations scheduled

At this stage, the material availability check is only available for production orders that are job scheduled. There is not really a good reason why operations scheduled orders would require a different process. Please enable the functionality for the operations scheduled production orders.

Read more...

8 Comments

Read more... 8 Comments

Category: Production Control (237)

STATUS DETAILS
Under Review
7

Delete the production wave

When working with production orders and advanced warehousing, one creates warehouse work when one releases the production order. But in case of shortage , no materials are available at all, no work is created at all. But the wave is. If I solve my shortage and want to release again, I get an e...

Read more...

2 Comments

Read more... 2 Comments

Category: Production Control (237)

STATUS DETAILS
Declined
17

Mobile device users should not be allowed to post Pick Journal

This idea concerns mobile device in Manufacturing context, in particular the ability to record Picking list through mobile device application included in ADWMS Module. It deals about D365 mobile device menu called Register consumption which enables to record Batch order Pick list. Mobile devic...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (237)

STATUS DETAILS
Under Review
4

warning when the user receives a subcontract PO

A production order has to be started in order to post any journals. But when I have parameters for auto post Picklist and auto post Route card after receiving a subcontract PO, there is no warning. The PO is received but no postings for the prod order of any kind are possible. we need a warnin...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (237)

STATUS DETAILS
Needs Votes
18

Flushing of rawmaterial when co-products are being reported as finished

In the proces industry we are working with the planning item, where all output is being reported as co-products. Now and then, we need to auto-report consumption og cartons, etc. This is not supported as of now. According to product group this is a product limitation as the problem is that the...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (237)

STATUS DETAILS
Under Review
4

Add parameter to Mfg execution prod order defaults

1.The "backflush BOM materials at start": parameter = yes and I am using advanced warehousing. I am also having multiple picking rounds for one prod order because not all materials are always there at the start. I want to pick and then backflush what I have and pick and backflush the rest late...

Read more...

3 Comments

Read more... 3 Comments

Category: Production Control (237)

STATUS DETAILS
Needs Votes
7

change parameter "Defer updates of cost calculation until production order reaches ended status"

If I understand the Parameter correct: The parameter prevents the cost calculation until the production order is ended (and there is no way to correct it again). In my opinion, it would be helpful to skip it until the production is reported as finished. In that case you have a chance to make c...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (237)

STATUS DETAILS
Needs Votes
45

Report scrap quantity from mobile device

It would be great advantage to be able to not only report a good quantity as finished with the mobile device menu items "Report as finish" and "Report as finish and put away", but also be able to report a scrap quantity at the same time. The handling/posting of the material for the scrap quant...

Read more...

3 Comments

Read more... 3 Comments

Category: Production Control (237)

STATUS DETAILS
Under Review
7

Consolidated Batch Orders should be able to have capacity reservations.

In process manufacturing there is frequently a structure of:

 

  • Bulk Batch product RFBulk - Radiator Fluid
  • Packed Batch product RF1- 1 Gallon Radiator Fluid
  • Packed Batch product RF5 - 5 Gallon Radiator Fluid
  • Packed batch product RF55 - 5...

    Read more...

    1 Comments

    Read more... 1 Comments

    Category: Production Control (237)

    STATUS DETAILS
    Needs Votes