Shelf Life Period in Days must be in New Released Product dialog
Shelf Life Period in Days must be in New Released Product dialog for the Batch-enabled Items with FEFO-controlled Model group.
That's Mandatory field, which remains empty otherwise.
Shelf Life is critical in LifeSciences.
HSN/SAC Item configuration wise how to attach
Impossible to add new circular references BOM lines in ECO
In the BOM of an engineering change order (ECO):
- I get an error message when I add a new circular reference, i.e. when I create a BOM line to add another version of the same item number.
- However, I manage to modify an existing circular reference (created from the BOM of th...
STATUS DETAILSNew
Engineering Change Management - Copy BOM Line Effectivity Dates
BOM line effectivity dates should be copied from the Engineering company BOM to the Transactional company BOM when copy BOM functionality is used in the Eng Chg Mgmt product release policy.
item Coverage and Sales hierarchy to be Auto populated through Local templates managed through release policy
Hi,
If we use the functionality of Engineering change management to release items from Master company to Local company and if we have items in common across legal entities.
With release policy local template we should be able to release items with fields of I...
Show PRODUCT INFO DISPLAY LANGUAGE PARAMETER in user preferences
In regard to the new features which is addressed to be a very useful feature that was added to the Product information parameters
(Display product info in user's language & User specific product name and description)
The issue here is that the users should be having an Admin privil...
Sell start date on product variant
This field exitst on Product master and it would be great to have this on product variant as well with the same functionallity.
Reporting a production order as finished prior to start the quality order should not create quality order
Current behavior:
For production orders, which include a quality order on their BOL, an error message "quality order has been generated" is showing when trying to report the production order as finished, even though the quality operations hat not been started. Also under the qual...
Fixed run time in routing and capacity planning
Add new functionality in the item routing to add a fixed run time.
We produce products that have to stay a certain amount of days in a tunnel.
Each tunnel is a machine and it does not matter how large the batch is. The duration is always the same.
Add 'Modified by' field available to be added to 'Sizes' table (RetailEcoResSize)
'Sizes' table (RetailEcoResSize) has 'Modified date and time' field, but lacks 'Modified by' field. This is a very informative field to be utilized with already existing field 'Modified date and time' and can be used to track changes made by end users (in cases where customer needs to know onl...