12

Production floor execution is missing focus point on start page.

When opening the production floor execution interface there is no focus point in the start page. Meaning that if you want to clock in using a badge ID that you scan via a card, reader nothing will be read as the field isn't activated before you manually click in it.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (461)

STATUS DETAILS
Completed
Ideas Administrator

Thank you for your feedback. We released this feature as part of a bug fix in release: 10.0.25

Sincerely,

Johan Hoffmann

PM, Microsoft

9

Data Entity for Production Order

Create data entity in D365ffO for Production Orders.

A partner has 2 D365ffO projects. And in both projects, Production Order integration to other system is requirement.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (461)

STATUS DETAILS
Completed
Ideas Administrator

For the fall release 2017 we have implemented Production order, Production BOM and Production Route entities. They do however come with the limitation that you can only create or update production orders in state "Created". On the export side there is no limitation. The RTW of the Fall release should happen any day.

If you need these entities on a different version than the Fall release, please create a backport request. If you need production entities that can update production order information in a different state than created, please create a new product idea for that.

Conrad Volkmann 

 

8

Production floor execution - attachment preview is small

Preview of attached file or note is small, It is thin although there is enough space to make preview higher and wider

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (461)

STATUS DETAILS
Completed
Ideas Administrator

Thank you for your feedback. We enhanced this feature so attahcments now are using the full space in the dialog in the production floor execution interface.

Sincerely,

Johan Hoffmann

PM, Microsoft

8

Better support for backflush of unreserved material

When running production orders with manual BOM line reservation in a WHS controlled warehouse, it is not possible to find the production Input Location for backflushing the BOM line material if the picking list journal is created in relation to a route Card Journal. It only...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (461)

STATUS DETAILS
Completed
Ideas Administrator

Thank you for your feedback. This functionality is supported in the current version of the product.

This functionality was made available August 2016.

Sincerely,

Johan Hoffmann

PM, Microsoft

7

Production floor execution - Grid overview when reporting the progress of bundled jobs

It would be useful to add the option of reporting the progress of a job bundle from a grid, similarly to what happens when the job bundle is started.

Currently jobs are displayed sequentially: the first job is displayed, and after the quantity in entered you navigate to the next job in t...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (461)

STATUS DETAILS
Completed
Ideas Administrator

This functionality is now supported in version 10.0.40 of the product.

Sincerely,

Johan Hoffmann

PM, Microsoft 

7

Make BOM visible in Production Floor Execution

A great feature to add to the Production Floor Execution would be the possibility to see the BOM of the production order. Just like the instructions button, there should be a BOM button to show all parts used / picked / started on the current production order.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (461)

STATUS DETAILS
Completed
Ideas Administrator

Thank you for your feedback. We released this feature as part of the functionality Register material consumption on the production floor execution interface.

Sincerely,

Johan Hoffmann

Product Manager, Microsoft

7

Job card device - Add license plate functionality to reporting progress

When reporting progress on a production order using the job card device, you are not able to put the assembled/produced item on a license plate, like the terminal has. When the production output location is license plate controlled, this option should be enabled on the device.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (461)

STATUS DETAILS
Completed
Ideas Administrator

Thank you for your feedback.

We released this feature as part of the functionality in Dynamics 365 Finance and Operations, Release 10.0.6

Please refer to the following link for more information: 

  https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/report-finished-job-device

 

Sincerely,

PM, Johan Hoffmann

Microsoft.

7

uneven sorting of planned production order line based on requirement dates

When opening the net requirements screen from an planned production order the form does not sort based upon requirement date as designed. When the form is launched for released products the form is sorted properly. Repro steps: go to Production control -> Production orders -> Planned pro...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (461)

STATUS DETAILS
Completed
Ideas Administrator

Thank you for your feedback. We have fixed this issue.

  

Sincerely,

Johan Hoffmann

PM, Microsoft

6

Production floor Execution - assitant, assist resource

New Production floor execution is missing Assistant / Assist resource functions that are preventing us from using it. These were available in the older job card device view.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (461)

STATUS DETAILS
Completed
Ideas Administrator

Thank you for your feedback. The Assistant and assist resource functionality is now available in the production floor execution interface.

Sincerely,

Johan Hoffmann

PM, Microsoft

4

on-screen keyboard Running Production Floor

Insert a numeric keyboard to enter the employee code on touch screens


The keyboard can be identical to the one used to enter the quantity to start or report progress.


form: JmgProductionFloorExecution



In this link an idea of ​​how i...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (461)

STATUS DETAILS
Completed
Ideas Administrator

Thank you for your feedback. We released this feature as part of the functionality in release 10.0.31.

Here is how to enable the feature and get the numpad shown in the sign page for the Production floor execution interface:

  1. Go to feature management and enable feature: Enable use of a numpad in the sign-in page
  2. Go to page Configure production floor execution and enable parameter: Enable numpad

Sincerely,

Johan Hoffmann

PM, Microsoft