5

Don't limit rescheduling of production orders

With the arrival of Advanced warehousing there is "picking work" for a production order. We found that open picking work stops the rescheduling of the prod order. we do not understand why this is good functionality. It creates a lot of problems for those companies that do not pick all Prod BOM...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (519)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback.

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann 

PM,

Microsoft.

5

When the subcontract production is scheduled with finite material purchase order work flow should be submitted only once

When the subcon production is scheduled with finite material enabled check mark, purchase order work flow should submit only once. As of now it is submitting multiple times which is taking time and users are also not happy with multiple approvals

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (519)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann

PM, Microsoft

5

No set up job and process JOB Id's please when there is zero time

When I schedule a prod order, the system generates setup job and process job id's for every set up and run time on every operation even is the time on these is ZERO . When you , by mistake, scan one of those you get "job not found". This makes no sense. A routing setup of zero time should wast...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
Needs Votes
Ideas Administrator

 Thank you for your feedback.

We need some more details to understand your suggestion better. Can you please help us by answering the following questions?

  • As I understand you have operations that should not be job managed (i.e. the jobs from those operations should not be visible on the job card terminal or device) ? If that is true, have you then considered using a Route group where job management is disabled for those operations? 

 

Sincerely,

 Johan Hoffmann

PM,

Microsoft.

5

Add the option "All users" to the document group option

Right now we have to add all the names of the production workers to a list if we want them to read work instructions in the job card device or the job card terminal. Customers so far do not seem very interested in cherry picking certain inviduals. Work instructions are for everybody. We suggest a...

Read more...

2 Comments

Read more... 2 Comments

Category: Production Control (519)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann

PM, Microsoft

5

Add a Y/N setup in MES to default the start quantity

If the "start" function is not used at the production level then, when the operator starts an operation in MES, s/he must enter a quantity in order to get a correct picking list. I propose a new Y/N setup which defaults the quantity, so the operator doesn't have to deal with that quantity.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
Declined
Ideas Administrator

Thank you for your feedback. We are not considering the suggestion at this time due to the following reason: 

  • This suggestion will be considered for the Production floor execution interface.

Sincerely,

Johan Hoffmann

PM, Microsoft

5

Add parameter to Mfg execution prod order defaults

1.The "backflush BOM materials at start": parameter = yes and I am using advanced warehousing. I am also having multiple picking rounds for one prod order because not all materials are always there at the start. I want to pick and then backflush what I have and pick and backflush the rest late...

Read more...

3 Comments

Read more... 3 Comments

Category: Production Control (519)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. We need some more details to understand your suggestion better. Can you please help us by answering the following questions?

When you start only operation 10, then only materials for operation 10 should be flushed (if flushing is set up to happen at Start). If that is not the case you might consider logging a support case for our further investigation. 

 

Sincerely,

Johan Hoffmann

PM, Microsoft

5

Consolidated batch orders with more than 1 level

There is a main formula than contains a packed item which has a bulk item linked to it. When using the Firm consolidated batch orders form, it only shows the packed and the bulk items but nothing about the main formula. Customer needs to firm from the main formula to the next levels (which usu...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (519)

STATUS DETAILS
Declined
Ideas Administrator

Thank you for reaching out. Your suggestion seems to be a duplicate of the following suggestion:

Consolidated Batch Orders

Please add your valuable votes and comments to the suggestion above instead.

 

Regards,

<Your Name>

PM, Microsoft

4

Retain resource on interrupted production jobs (Process Type)

Dear Team,


The current functionality of the periodic task "Scheduling jobs" in Dynamics 365 does not retain the same resource for process-type jobs that are in an interrupted or waiting state when the associated setup job has ended. When these jobs are rescheduled, the system ...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
New
4

Quality order test results in Production floor execution form

It is very common on manufacturing scenarios to generate quality orders during the manufacturing process. In scenarios where Production Floor Execution (PFE) is used, the user doing the production inputs via PFE usually has to input the test results. This is a common modification to allow the ...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
New
4

Change color theme on the Production Floor Execution Interface (PFE)

As part of the configuration of the Production floor execution interface, it should be possible to choose between two theme colors: blue (existing) and white. If you find this idea interesting, please add your vote.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (519)

STATUS DETAILS
New