6

Route scrap to consider for CW product estimation in batch order

Currently there is no option to configure scrap % for CW products neither in formula nor in route. Most of our customers having CW products which generates scrap during production. Without this option it is difficult to manage cost and child product quantity required for production. It will be re...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (461)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann
PM, Microsoft

6

Change the "accept error" functionality

This parameter "accept error" , used during Report as Finished transaction, is a questionable design. THe design should be changed. 1 it should be clear what type of error is suppresses. Some errors are indeed non-consequential and should be suppressed. (even better. the error should not even ...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (461)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback.

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann 

PM,

Microsoft.

6

Flushing principle should be considered for Planning items

Manufacturing execution using a Planning item that outputs multiple Co-products does not support flushing principle 'Finish' when reporting as finished by operation (EG: From operation = 10 and To operation = 10).
No picking lists are posted with formula lines pointing towards the specif...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (461)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Johan Hoffmann

PM, Microsoft

6

Job card device to allow user to register time on project activities

Currently job card device allows users to register time only on production orders. There are lot of scenarios where projects are used to execute a special order. In such situation user is not able to register time in project activities using job card device. Enabling project activities in...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (461)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Conrad Volkmann

PM, Microsoft

5

Enable registration of SWITCH codes

Not possible to registrer times in Production Floor Execution on SWITCH codes. This is a large hinderance for using the Production Floor Execution fully.


So far all in my business network did mitigate by either buying a third party software or do a code change of D365 SCM.

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (461)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback.

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann 

PM,

Microsoft.

5

The start job Button should be disabled on the Production floor execution after starting a setup job

Issue:

  • The start job Button is active on the Production floor execution after starting a setup job.


Idea:

  • As per the intended design, the setup jobs cannot be started more than once so from a user expe...

    Read more...

    0 Comments

    Read more... 0 Comments

    Category: Production Control (461)

    STATUS DETAILS
    Needs Votes
    Ideas Administrator

    Thank you for your feedback.

    Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

    Sincerely,

    Johan Hoffmann 

    PM,

    Microsoft.

5

From On Hand List - Related Information - View Formula

Currently when you view On Hand List > Related Information > Formula - The formula that shows up is not related to the item selected, the default shows the first formula number. It would be good to have this show the formula for the item selected on the on hand list at the time or to gray out ...

Read more...

2 Comments

Read more... 2 Comments

Category: Production Control (461)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback. This is a great suggestion!

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann

PM, Microsoft

5

Show assistants on Job Card Device and Production Floor Execution Interface

Our operators work on jobs in teams of 4. They are constantly assisting the wrong pilot, forgetting to clock in, etc. It is impossible for them to look at a screen and see if they chose the right pilot, if they logged in, etc. This whole program is built for computer savvy people to use, which...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (461)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback. This is a great suggestion!

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann

PM, Microsoft

5

Autofilter resource group in Production floor execution

We find it very useful to have the Production floor execution auto-filter with the resource group of the logging worker.

Example: I am a worker in resource group 1. When I log in to a Production floor execution terminal, the filter (form: JmgProductionFloorExecutionDeviceConfiguration an...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (461)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback. This is a great suggestion!

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

Johan Hoffmann

PM, Microsoft

5

Dynamics 365 Production order finished good raw shortages inquiries and shortage tracking

Wish there is an option to easily visualize production order for finished good for associated for related BOM (s), raw components or elements for shortages. Not featuring shortage quick inquiries, before initiating a production order, user might process multiple inventory inquiries, or other.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (461)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your feedback. We need some more details to understand your suggestion better. Can you please help us by answering the following questions?

In the Production floor managment work space it is possible to check production orders for material availability before releasing them to the shop floor for execution. Supervisors can use this option be selecting the tile Production orders to release. Can you clarify if this option is fulfilling what you are looking for with regards to inquire material shortage. If not, can you provide more details for example by providing a wireframe and a description of a typical use case?

Sincerely,

Johan Hoffmann

PM, Microsoft