    Please adding more update details in update notification.

    Suggested by Keyu Li New  0 Comments

    We hope to receive more detailed information about future updates in the update notifications or emails. This would allow us to better prepare for the updates and help avoid potential issues that might arise from them.


  • 2

    Allow scheduling a series of dependent resource requirements, such as medical appointments for consultation + surgery + post surgery inspection

    Suggested by Shai Enat New  0 Comments

    Instead of booking a single appointment, allow scheduling a series of appointments with time range limitations between them (i.e. inspection must be between 5-10 days after the surgery). In order to book all appointments in the series at once the popup to select a time slot should be "wizard like" and show the list of appointments that await scheduling and then allow scheduling them one after the other, with logic to show the allowed time range for each appointment.



  • 6

    Field Service Scheduling Map must be improved

    Suggested by Shubham Agarwal New  0 Comments

    Field Service Scheduling Map must be improved. It should be more flexible to display the jobs on Map based on Work Order Types in different colors and Icons. Also, the Engineer and Job routes should be shown in different color or lines based on System Status. Time and Distance should be visible on map route based on current live geo location so that Planner/Dispatcher can lively track their Location on map and better plan the jobs.

    There should be some option when someone click on Engineer or any particular Job on map and it should show all near by jobs.


  • 2

    Sync Work Orders from Field Service Calendar to Outlook

    Suggested by Mathis Metivier New  0 Comments

    Enable synchronization of work orders from the Field Service calendar to the Outlook calendar. This feature would help technicians and other field service personnel by providing a unified view of their schedules across platforms, reducing the risk of scheduling conflicts and improving planning efficiency.


  • 1

    Show Audit History on Seperate Tab

    Suggested by Shubham Agarwal New  0 Comments

    Product should have some feature to show the Audit History on Seperate Tab or Section on the Form to make form more user friendly. Also It will even better if that Audit is shown in some more representable way with some icons, graphs or some more inputs. It will help Business to understand history of Assets linked to the customer in complete journey.


  • 1

    Filter Rating Models by Characteristic Selected

    Suggested by Antonia Wolf New  0 Comments

    Currently when filtering the schedule board by skills, you must pick the rating value after. It pulls in all rating values that might not even be related to the characteristics' rating model.


    My suggestion is the following:

    1. If a characteristic is selected and that characteristic has a rating model, then only show rating values associated to the rating model.
    2. If a characteristic is selected and that characteristic does not have a rating model, still show all rating values.

  • 2

    Update the calendar in the mobile app

    Suggested by Antonia Wolf New  0 Comments

    Can there be a way to identify dates a resource is scheduled via the calendar monthly view?


    Expected behavior - when user looks at calendar monthly view, there is a visual identifier on the days they are scheduled. I.e. in the month of february, I am scheduled the 10th-15th, and the 29th. As a user, it would be beneficial instead of scrolling the agenda list to see from high level I am scheduled those dates.




  • 2

    Schedule board - Enable grouping in requirements panel

    Suggested by Eline Blom New  0 Comments

    The requirement panel in the schedule board does not support grouping, like OOB in Dynamics.


    If your view filtering contains a 1:N relationship, it will show more lines of the same requirement.

    Eg.

    1 resource requirement > related to

    1 workorder > related to

    3> records of a custom entity

    gives 3 lines in stead of 1 line expected and shown in the view.





  • 26

    Possibility to manage customized start and end resources locations on specific dates

    Suggested by François SEJOURNE New  0 Comments

    Ability to manage and specify customized start and end ressources locations on specific dates instead of 'Resource Address' or 'Organizational Unit Address'. It will optimize ressource scheduling in many cases, for example when technicians sleep at the hotel.


  • 11

    Send notices before modifications or changes the behavior of the product

    Suggested by Bin Jiang New  0 Comments

    After a previous update, we noticed a change in the behavior of the Schedule Board, where after the first assignment, subsequent allocations would use the default value instead of the Duration value, which led to two issues:

    1. When a user wants to book multiple resources for an event, additional operations are required
    2. Our previously deployed custom solution conflicts with the current behavior, resulting in a bug


    Based on the above, we would like to be able to send a notice and explain the discrepancy before a modification is made to the product behavior so that we can pay attention to it in advance