Transfer all posting errors to a new Journal" function is not working while posting Picking list journal.
The current functionality ‘Transfer all postings errors to a new journal’ misleads users who lack familiarity with the 'Selection by' configuration.
Design proposal:
1) If we set “Transfer all postings errors...
Improve master planning of long-lead time items transferred to distribution warehouse
Our client has a distribution warehouse and a manufacturing warehouse. The manufactured stock is always transferred in full to the distribution warehouse (manufactured stock is not stored in the manufacturing warehouse).
If the system falls below safety stock within the lead time...
The import of the product route operation properties (using "Engineering change order product route operation properties V2" entity) fails when trying to modify lines with Change type "Unchanged".
Title:
Enhancement of the “Engineering Change Order Product Route Operation Properties V2” Entity in Dynamics 365
Description:
In Dynamics 365, when importing product route operation properties usin...
Thank you for your feedback. This is a great suggestion!
Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.
Sincerely,
Johan Hoffmann
PM, Microsoft
LP to be considered by the work template of production raw material picking work
When marking an item in a PO line for a production order which is received and put into the store location and assigned a LP. Then try to pick it with the LP it gives an error. When further investigated, we concluded that this is because the production picking doesn't concern with reading the ...
Thank you for your feedback.
Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.
Sincerely,
Johan Hoffmann
PM,
Microsoft.
Adding a keyboard on the production shop floor terminal
In some cases client's need to have the option to add letters instead of just numbers on the terminal for the license plate the serial number. Therefore, it would be helpful to have a keyboard.
Thank you for your feedback.
Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.
Sincerely,
Johan Hoffmann
PM,
Microsoft.
Left/Right navigation on new grid control does not perform as expected
Actual Result: Since upgrade to PU53, customer is not able to use left/right arrow to scroll horizontally in the grid on the forms. Also, when the data list is greater than the display window it is shown in, Customer is required to use SHIFT Key Along with Mouse Scroll to scroll horizontally i...
Thank you for reaching out. Your suggestion seems to be a product bug. Please reach out to the relevant support channels.
Sincerely,
Johan Hoffmann
PM, Microsoft
Production floor execution - Grid overview when reporting the progress of bundled jobs
It would be useful to add the option of reporting the progress of a job bundle from a grid, similarly to what happens when the job bundle is started.
Currently jobs are displayed sequentially: the first job is displayed, and after the quantity in entered you navigate to the next job in t...
This functionality is now supported in version 10.0.40 of the product.
Sincerely,
Johan Hoffmann
PM, Microsoft
Make BOM visible in Production Floor Execution
A great feature to add to the Production Floor Execution would be the possibility to see the BOM of the production order. Just like the instructions button, there should be a BOM button to show all parts used / picked / started on the current production order.
Thank you for your feedback. We released this feature as part of the functionality Register material consumption on the production floor execution interface.
Sincerely,
Johan Hoffmann
Product Manager, Microsoft
Allow users to see Materials used for each operation on Job Card Device
Unlike the Job card terminal, users cannot see which/how much materials they have to use/consume on the Job card device. Having the materials defined per operation would be great in the combination with Description/Instruction on the Job card device.
Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.
Sincerely,
Johan Hoffmann
PM, Microsoft
Job card device - Add license plate functionality to reporting progress
When reporting progress on a production order using the job card device, you are not able to put the assembled/produced item on a license plate, like the terminal has. When the production output location is license plate controlled, this option should be enabled on the device.
Thank you for your feedback.
We released this feature as part of the functionality in Dynamics 365 Finance and Operations, Release 10.0.6
Please refer to the following link for more information:
Sincerely,
PM, Johan Hoffmann
Microsoft.
Administrator
Thank you for your feedback. This is a great suggestion!
Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.
Sincerely,
Johan Hoffmann
PM, Microsoft