30

Catch Weight product: Consume only inventory quantity in picking list journals for Batch orders

When you have raw materials which are not fully consumed in an order (int consumes only part of the weight) the picking list cannot be modified if you try to only update the inventory quantity and 0 cw quantity because the cw unit still remains in inventory.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (325)

STATUS DETAILS
New
6

Functionality to reverse the Production Order (the one ended by mistake)

There should be an option to reverse the end of Production.

In many cases, due to human error, by mistake the Production Order get ended by the user. In such cases it is lot of work that has to be done again, such as:


2

Autofilter resource group in Production floor execution

We find it very useful to have the Production floor execution auto-filter with the resource group of the logging worker.

Example: I am a worker in resource group 1. When I log in to a Production floor execution terminal, the filter (form: JmgProductionFloorExecutionDeviceConfiguration an...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (325)

STATUS DETAILS
New
3

Ability to override production control default parameter for "Requirement for material reservation" by item (and maybe item model group)

In multiple projects clients have needed the default release to warehouse parameter for "Requirement for material reservation" to be

"Require full reservation", however for a small subset of items they do not want this parameter due to the nature of the business process for those items....

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (325)

STATUS DETAILS
New
52

Personalize the grid view on the PFE (Production Floor Execution) Application

I have been testing the PFE (Production Floor Execution) and could extend the grid on the PFE with further columns (e.g. Resource and Operation), which is very nice and absolutely needed.

However this could not be saved as view and the columns were removed again when the form was opened ...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (325)

STATUS DETAILS
Completed
32

Registration on project activities on the production floor execution interface (PFE)

On the production floor execution interface (PFE), workers should be able to register time spent and material consumed on project activities. It should be possible to enable this option by configuration for example by adding a new tab to the configuration for project related tasks.

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (325)

STATUS DETAILS
Needs Votes
51

Quality management in production floor execution interface (PFE)

I would like to receive your votes for the following functionality in the production floor execution interface (PFE):

  • It should be possible for users of PFE to enter test results for quality orders generated with a route specific quality association.
  • It should be possible...

    Read more...

    6 Comments

    Read more... 6 Comments

    Category: Production Control (325)

    STATUS DETAILS
    Needs Votes
8

MES integration - Add AutomaticRouteConsumptionRule to start message

The new MES integration feature includes the possibility to send a start signal. This start signal do not include message about route consumption, which is standard if starting from the D365 client.


The issue at the moment is that the route consumption is then controlled by t...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (325)

STATUS DETAILS
New
5

Dynamics 365 Production order finished good raw shortages inquiries and shortage tracking

Wish there is an option to easily visualize production order for finished good for associated for related BOM (s), raw components or elements for shortages. Not featuring shortage quick inquiries, before initiating a production order, user might process multiple inventory inquiries, or other.<...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (325)

STATUS DETAILS
Under Review
5

Production floor execution - Grid overview when reporting the progress of bundled jobs

It would be useful to add the option of reporting the progress of a job bundle from a grid, similarly to what happens when the job bundle is started.

Currently jobs are displayed sequentially: the first job is displayed, and after the quantity in entered you navigate to the next job in t...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (325)

STATUS DETAILS
Under Review