Remove Maintain resource requirements wizard from routing screen

The wizard called "Maintain resource requirements" should not be showing as a choice in the routing. It is a mass update thing and should only be in the periodic menu choices. Because the wording is so simlar to the tab "resource requirements" the user may be tempted to click on the wizard instea...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (457)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Johan Hoffmann

PM, Microsoft

3

Revision level information on Bill of materials

Most of the manufactiuring companies will be doing revisions to thier Bill of material structure due to multiple reasons such as new research to improve product, unavailability of old parts etc. It would be better if there is an option on the BOM lines to maintain the revision level so that use...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (457)

STATUS DETAILS
Needs Votes
3

Improved Consistency Check for Routes

Add logic to the consistency check for routes to verify that there are properties assigned to a route operation AND at least one resource requirement record for the route operation. When performing an import of route lines, 10's of thousands sometimes, it is very easy to miss a record in the dat...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (457)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Søren Vagn Andersen, Principal Program Manager, sorenand@microsoft.com

Microsoft Dynamics 365 Supply Chain Management

3

Not necessary lines under the jobcard terminal log book

In logbook that stop job type of registration should not be there like wise in approve form. Steps: 1. Step: Log in into job card terminal 2. Start an indirect activity 3. Start an other indirect activity 4. Go to the logbook For the Workers is this very confusing. It would be better to have i...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (457)

STATUS DETAILS
Declined
Ideas Administrator

Thank you for your feedback. We are not considering the suggestion at this time due to the following reason: 

  • We will be considering this idea when implementing the log book on the Production floor execution interface.

Sincerely,

Johan Hoffmann

PM, Microsoft

3

Setup for BOM to be mandatory in Production Order

At present there is no option to make BOM consumption mandatory in Production Order. Also system is allowing to do Production without any consumption. There should be a setup to disable or enable Production order without any consumption or BOM.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (457)

STATUS DETAILS
Declined
Ideas Administrator

Thank you for your feedback. We are not considering the suggestion at this time due to the following reason: 

  • This idea has not received enough votes since it was logged.
  • As an alternative you can use formulas instead fo BOM's. For creating a batch order it is required to specify a formula.

Sincerely,

Johan Hoffmann

PM, Microsoft

3

Time and Attendance profile calendar special days

2 ideas: 1. Make profile calendar & lines importable. Currently it is not. It adds lots of manual work to set it up for large number of employees in multiple groups. 2. Add ability to use half day in special days. There are cases when we need to assign half day off for employees.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (457)

STATUS DETAILS
Needs Votes
3

Adjust duration on production job based on already RAFed quantities

Make it possible to adjust duration on production job based on already RAFed quantities.



For example, production order is for 500 pcs, route specified 1min/pcs.

When originally scheduled, production job was for 500 mins.

Then I posted job card for 5...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (457)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Johan Hoffmann

PM, Microsoft

3

Also group by item on purchase orders generated through production subcontracting with service items

I am working in a textile company which has production subcontracted in diverse countries and we try to generate the subcontracting purchase orders. Grouping by vendor or date work great but we still miss the possibility to group by item. In our case we have different production orders by item...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (457)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Johan Hoffmann

PM, Microsoft

3

Data entity for Batch route operations

There is currently a data entity for Production Route Operations. From working with Microsoft, by design, this data entity is filtered to only pull PRODUCTION route information. For those of us using Batch orders, this does no good. From working with Microsoft we were told we would have to bui...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (457)

STATUS DETAILS
Declined
Ideas Administrator

Thank you for your feedback. This seems like a product bug, as there should be no difference between a route on a prodction order and a batch order. Please log a support request to get this fixed.

Sincerely,

Johan Hoffmann

PM, Microsoft

3

Multi-site Job Budling

Scenario: A company has several manufacturing sites, all within the same legal entity and manufactures different components for different industries at each of the sites. However, there is one specialist operation that is based at one of the sites but receives works orders from the other sites...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (457)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback.

Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

 Johan Hoffmann

PM,

Microsoft.