5

Make Job card terminal paper clip great again

At Job card terminal, the paper clip button, normally showing the number of attachments for the current record elsewhere is the system, always shows zero now. It shows that there are zero attachments even when there are connected attachments (to production order, operation, connected BOM lines et...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (237)

STATUS DETAILS
Needs Votes
2

Production Sequencing Has Effective Dates

The current sequencing groups for batch order sequencing are applied to the resource. This means that the Master Plan will run with the same rules for all periods until we change the sequence group details. Real life scenarios do not work like that. Planners will run a certain sequence for a per...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (237)

STATUS DETAILS
Needs Votes
4

Production sequencing to extend to firmed Production and Batch Orders

Currently, sequencing is limited to Planned Batch Orders. This functionality can easily be extended to firmed batch orders. The same logic applies. It can also be extended to Planned production orders and firmed production orders.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (237)

STATUS DETAILS
Needs Votes
34

Add ability to Import Kanban Rules and Kanbans

Customers wishing to use Kanban do not currently have a way to import Kanban Rules or Kanbans. Working with a customer currently that has 1400 Kanban rules and will have many more Kanbans to create from those rules. Ideally would be able to import Production flow activities, Kanban Rules and...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (237)

STATUS DETAILS
Needs Votes
2

Scheduling using synchronization function for multiple packed batch orders for on bulk batch order

Restriction at this moment : For a formula line of bulk item in packed batch order you are having a LOTID value which can point to only one batch order header for the bulk item Suggestion : Having the possibility where multiple LOTID values related to multiple formula lines for bulk item can b...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (237)

STATUS DETAILS
Needs Votes
11

Production floor execution is missing focus point on start page.

When opening the production floor execution interface there is no focus point in the start page. Meaning that if you want to clock in using a badge ID that you scan via a card, reader nothing will be read as the field isn't activated before you manually click in it.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (237)

STATUS DETAILS
Needs Votes
1

Production floor execution is missing focus point on start page.

When opening the production floor execution interface there is no focus point in the start page. Meaning that if you want to clock in using a badge ID that you scan via a card, reader nothing will be read as the field isn't activated before you manually click in it.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (237)

STATUS DETAILS
Needs Votes
27

Create transfer order from BOM/Formula

When subcontracting a production order, raw materials may be sent from an internal warehouse to the subcontractor. This idea is to add a feature to create the transfer order by selecting lines in the Production BOM and generating the transfer order. Marking each transfer order line to the to th...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (237)

STATUS DETAILS
Needs Votes
16

Barcode scanner function for Production Floor Execution Interface

The brand new Production Floor Execution is great, but missing the barcode scanner function as used in the Job Card Device. Please add the barcode function, otherwise we (and many others) will not be able to use it....

Read more...

2 Comments

Read more... 2 Comments

Category: Production Control (237)

STATUS DETAILS
Needs Votes
5

Improve subcontracting: we want multi-line PO's!

Typically a planned prod order, after firming, is created in the scheduled status. This means that any subcontracting PO has already been created. It will be line line PO just for this one prod order. Most customers don't want that. They have a lot of subcontr work they want to combine in one ...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (237)

STATUS DETAILS
Needs Votes