Manufacturing execution should allow production job resource rescheduling.
On occasion production jobs cannot be run on the original scheduled resource due to unforeseen issues. Requesting jobs to be rescheduled by a production planner can be a cumbersome and time-consuming process. Allowing a production worker to select a different resource from the Start job screen...
Displaying the variant name in the production orders instead of the description name of the product master.
The All production orders form page as well as the pop-up menu doesn't display released product variant name, but instead the normal description of the product master is used.
The users need to see the variant name displayed in the product name field and needs to make sure th...
Allow BOM update in ‘Copy into legal entity’ data project
When using "Copy into legal entity" data project, entity: Bill of materials headers and versions V3, the copy job fails when a BOM Header changed, like date range, quantity, etc.
MES Framework - add a message to create a batch number
The MES framework currently allows the standard journals to be posted from the MES to D365 which includes a Report as finished (RAF) message for finished goods. However, if the batch number is being assigned in the MES rather than in Dynamics, the Report as Finished message fails as the batch ...
Re etimating Production orders deletes all existing Cost group lines at a lower level
Re estimate after picking list is posted deletes all existing Cost group lines on the Estimated and Realised (quantity and cost) at lower level (level 2) and only adds back the Estimated quantity and cost at the lower level. Resulting in the realise...
Shop floor terminal - Registration entries after switch of approval group not shown anymore
In time and registration module, when we setup approval group for employees.
Manager needs to approve/transfer/calculate manufacturing execution entries for all the shop floor users using shop floor terminal execution.
The issue we have noticed , when approval...
Material stockout list - allow for product name and inventory dimensions-Site/Warehouse
Path: Production control > Inquiries and Reports > Material stockout list / Material stockout list for batch orders.
The standard options of 'Material stockout list' and 'Material stockout list for batch orders' do not allow for the 'product name' to be added via personalizations (despit...
Generate packaging labels at Work/Production Order Start
Current D365 SCM functionality enables labels to be printed when a quantity of finished goods are reported as finished on a Work/Production Order.
For some manufacturing processes where multiple boxes of finished goods will be made this restricts the ability to label the boxes...
On the Batch balancing production (batch order), allow to use multiple times Release to warehouse button
Current design:
After initial release to warehouse after performing batch balancing process, there is no way to add additional formula lines/components to the batch order as the work for it will not be created and will result in the below error:
Feature Finite material scheduling for Planning Optimization should not thorw errors when enabled
We recently faced the situation of a trying to split a production order, and coming with a system error:
“Function ProdUpdSchedulingMps_Extension.updateSchedule has been incorrectly called”