12

Rounding Variance System Calculation Clarification Request

After creating a finished good that has a formula including a By-Product, and production order was completed and status set to "End", then the system generated Rounding variance for the By-Product item amount, and there is no documentation on clarifying the reason why the system genera...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (456)

STATUS DETAILS
Needs Votes
19

Allocation of Operation numbers on Production order BOM lines if using phantoms

The issue relates to the allocation of Operation numbers on BOM lines. If these BOM lines are classed as phantoms (or are below phantoms) in the multi-level BOM structure then the link to Operation number is lost if the phantoms don’t have routes (and the route is added to the top level item)....

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (456)

STATUS DETAILS
Needs Votes
2

Generate packaging labels at Work/Production Order Start

Victrex have some manufacturing processes that require multiple boxes to be packed as part of the same Work Order / Batch process. Victrex needs to print these labels at the start of the manufacturing process, so that labels can be added to each box before...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (456)

STATUS DETAILS
Needs Votes
16

Issues with rounding when decimal precision of 4 is used on BOM line and released qty = qty of on-hand

On our production orders we receive imports from an CAD software into the BOMs of Level 1 Production Orders. The information we receive is not per price produced but the complete quantity calculated in CAD for all pieces together. 


The goods needed for producing the level 1 Pr...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (456)

STATUS DETAILS
Needs Votes
7

Production order BOM line

Hello MS team,


In current system, It's been observed that when Production order is created, system does not get Location which is already defined on BOM line for the item. Below is the process summary for your reference.

 

1

Default values scrapp account on batch order not remembered

defined scrap account value on ending productiom order but scrap account not remembered.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (456)

STATUS DETAILS
Needs Votes
2

Implement from and to quantity for formula and route versions

Currently it is only possible to set up a "from fomula size" value on the formula version and a "from quantity" value on the route version of an individual item.

In many process manufacturing scenarios it would be of great advantage to also being able to set up a "to quantity" value for ...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (456)

STATUS DETAILS
Needs Votes
2

activate engineering versions using data entity

Currently, engineering versions are not active after the process of importing using released products V2 entity. By design, the active field is read-only and cannot be set with a data entity.


it would be helpful to allow for the setting of the active field within a data entity...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (456)

STATUS DETAILS
Needs Votes
17

Automatic resource consumption using Report as Finished journals

For items you can setup a flushing principle, e.g. Start or Finish, but on resources, you can only setup IF it should be flushed (using the Route group).

Even if you set resources to be automatically consumed, it doesn't work if you do report as finished using the Report as Finished jour...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (456)

STATUS DETAILS
Needs Votes
3

Manufacturing execution should allow production job resource rescheduling.

On occasion production jobs cannot be run on the original scheduled resource due to unforeseen issues. Requesting jobs to be rescheduled by a production planner can be a cumbersome and time-consuming process. Allowing a production worker to select a different resource from the Start job screen...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (456)

STATUS DETAILS
Needs Votes