9

Linkage between report as finished and picking list journal posted for serial number tracing

Serial number tracking functionality for Production orders in case of output requirement more than one quantity is not available. This is critical for any manufacturing site where serial number tracking is enabled. The purpose of enabling serial number is completely lost if we are not able to ...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (459)

STATUS DETAILS
New
1

When two quality orders are created with separate RAF and one is posted, the other quality order gets posted alongside

When a partial RAF is performed on production order and first quality order is kept unposted while the second quality order is posted, the inventory discrepancy is noted where the second quality order quantity is also showing as posted on the full batch on hand form.


Requireme...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (459)

STATUS DETAILS
New
2

When using Production Floor Execution, Secondary realized cost amount is not realized and stuck on Estimated.

When the primary operation is started the secondary operations are shown in stopped status. (This is okay)

But when you report a quantity on the primary operation the hours for that quantity is not applied to the secondary operations, which hold the cost categories. So no cost for the la...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (459)

STATUS DETAILS
New
67

Cannot save filtered view in production floor execution interface.

After filtering the columns in the production floor execution interface and saving it as a view, the filtered value disappears upon leaving or refreshing the form.


Despite being previously identified as a By-Design issue (857459), clients who are unable to filter and sort thei...

Read more...

3 Comments

Read more... 3 Comments

Category: Production Control (459)

STATUS DETAILS
Needs Votes
1

Place holder for Potency Management Extension

Place holder for Potency Management Extension

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (459)

STATUS DETAILS
Needs Votes
1

Power App Development for Potency calculation

Power App Development for Potency calculation

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (459)

STATUS DETAILS
Needs Votes
6

Visibility for operator in PFE to view reported progress for operation(s) with multiple resources

When a production operation is job scheduled and has multiple resources assigned [Resource load fast tab > Quantity greater than 1] and the job is released to production floor the operator is shown the full production quantity instead of calculated split quantity per job based on the number of...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (459)

STATUS DETAILS
Needs Votes
2

MES Integration - add Site and Warehouse to message headers and Manufacturing execution system integration form

Companies with several sites/warehouses doing manufacturing with an MES will be sending various messages from/to D365. The message headers only include a production order number, therefore if the person responsible for manufacturing in warehouse A wishes to check the status of the messages for...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (459)

STATUS DETAILS
Needs Votes
25

Enable reservation in Producton control parameters per site

Production control parameters by site is vital for companies that run various production processes in different sites.

One site might need reservation at a different step than another site. Especially if one site is running WMS and another site is not.


However, the reser...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (459)

STATUS DETAILS
Needs Votes
57

Quality order generation based on a time interval

Currently there is no functionality to have a quality order automatically generated based on a time interval i.e. have a quality order automatically generated every x number of hours against a production order which is in progress.


This functionality would allow a person who i...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (459)

STATUS DETAILS
Under Review