Independent operations on route
If there are routes with several differentiated operations (10, 20, 30, 40, etc) with link type strogn between them, it is not possible that, for example, operation 20 and 40 are the same type of work (for example, polishing) since it is not possible to assign the same operation code and have ...
Over production should reflected in started and remaining quantity
Currently there are 2 scenarios in production control > production floor execution which should be user configurable options according to below expectations:
- Over production should be reflected in started and remaining quantity - When the quantity gets ov...
STATUS DETAILSUnder Review
Batch balancing select should be per batch not per license plate
When performing batch balancing you have to select batch numbers as you are about to select and reserve batches depending on the attribute value of that batch. But the selection options are splitted by License plate (or at the lowest dimension).
...Production order print with the Label
Need an ability to print a Production order with the BOM and Routes ( Same function as the Production order report) from the Production order form with a Barcode for the Production order number. This can be enabled on Releasing the Production order and Starting the production order form.
Illustrations of non-produktive times in the routing
There are setup and run times in the routings.
Often, however, non-productive times are also required. Times that can be defined, for example
from the number of pieces 2000 after every 1000 pieces 15m partial setup.(Example: cable industry and embroideries)
The non...
All production orders to be updated with the feature "Enable partial receipt of subcontracted items and fix an issue with the calculation of scrap for BOM lines of type Vendor" enabled
Only first production order is updated when receive multiple subcontractor purchase orders at the same time in a "Product receipt" with "Enable partial receipt of subcontracted items and fix an issue with the calculation of scrap for BOM lines of type Vendor" feature enabled. We would like for a...
Dynamics 365 Supply chain Inventory Report BOM Mixture registrations (master and configurations)
Wish there is a future potential inventory report to be printed as per BOM mixture registrations (either master or BOM mixture registration configurations)., Not visualizing an finished good report per BOM mixtures registrations, user might not efficiently visualize finished goods (e.g. per formu...
Dynamics 365 Supply chain Inventory Batch BOM mixture registrations
Wish in the future there is potential option to easily register a BOM mixture on a potential item batch for specific date ranges (e.g. initial date and expiration date) for purpose of item batch control and batch production BOM mixtures used on finished goods or BOM mixtures master and BOM mixtur...
Dynamics 365 Supply chain Item master BOM Mixture main sources
Wish there is a potential option to easily visualize an item master with the type of BOM mixture main sources, not visualizing main sources of mixture from a BOM for a BOM master along with a BOM variations including inter dependable variables or inputs used, we may not be tracking traceability, ...
Dynamics 365 Supply chain Item variables configuration BOM Transfer
Wish there is a potential future option to easily update an item master product variables along with BOM transfer including (e.g. potential variables or input used, calculations, quality inspections, etc.) Not featuring option easily visualize item master with variables and variables from BOM or...