4

Add a Y/N setup in MES to default the start quantity

If the "start" function is not used at the production level then, when the operator starts an operation in MES, s/he must enter a quantity in order to get a correct picking list. I propose a new Y/N setup which defaults the quantity, so the operator doesn't have to deal with that quantity.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (226)

STATUS DETAILS
Needs Votes
1

Time registrations on Kanban activities

Hello, It would be interesting to have the opportunity to record the manufacturing time of workers on Kanban activities Thanks for this consideration Best regards André Becker

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (226)

STATUS DETAILS
Needs Votes
7

Allow cross docking PO - Prod order and Prod order- PRod order

This idea is an enhancement for the existing cross docking framework. The scenarios described below are very common in the discrete industry, especially in the complex equipment industry. scenario 1; No advanced warehousing. A production order has been released and started but there are materi...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (226)

STATUS DETAILS
Needs Votes
13

Improve error message when releaseing prod order to warehouse

When I release a prod order to warehouse and I don't have all the materials I get an error that mentions the LOT ID of the item that is short. With a little effort it should be possible to have this error message talk part numbers , with description, so the user knows exactly which items are s...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (226)

STATUS DETAILS
Needs Votes
25

CLose the loophole for Prod orders and RAF on the handheld

This is a rather serious flaw that needs to be addressed. We know that you can create and process a production order all the way without having a BOM. So you can make something out of nothing. Not sure whether I would allow that if it were my ERP system but we have accepted that for years. Now...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (226)

STATUS DETAILS
Under Review
7

uneven sorting of planned production order line based on requirement dates

When opening the net requirements screen from an planned production order the form does not sort based upon requirement date as designed. When the form is launched for released products the form is sorted properly. Repro steps: go to Production control -> Production orders -> Planned pro...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (226)

STATUS DETAILS
Completed
12

Owner dimension inheritance to production order BOM

In standard D365FO owner dimension (tracking dimension) is not defaulted to production order BOM line (like the own company owner dimension value inherits to sales order line). Thus, production picking list line is lacking owner dimension and therefore cannot be posted using backflushing (pick...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (226)

STATUS DETAILS
Needs Votes
0

On Voucher transaction, the date of Inventory cost revaluation and Production issue in Posting type are indicating incorrectly.

In the end of Production, on Voucher transaction, the date of Inventory cost revaluation and Production issue in Posting type are indicating incorrectly. Repro Steps 1.Create production order for #BOM_std (Quantity =1, site=1,warehouse=13) 2.Done Estimate 3.Done Start 4.Done Report as finished...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (226)

STATUS DETAILS
Declined
1

LIFE SCIENCES - Production Order completion status should default to Quarantine

When completing a Production Order, the completion step may be performed by a manufacturing user, however the lot should not show up in inventory as "available" until QC has finished their product testing & QA has reviewed the batch record (paperwork). As such, the production lot should co...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (226)

STATUS DETAILS
Needs Votes
3

Workspace production floor management

This workspace has all prod jobs lined up in the middle. It is however bad news to find out that none of these jobs show any dates. One has to personalize but that is not enough. the production order delivery date is an absolute must in this screen. Without that the user has no idea what the d...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (226)

STATUS DETAILS
Declined