5

PowerApps extensibility on Production Floor Excecution app

The possibility to embed Canvas PowerApps within PFE by adding configurable tabs and/or buttons. From PFE you can add JobID or MachineID to PowerApps as input variable.


With that we can offer standard D365FO capabilities and customer Canvas PowerApps in a single UI to the shop...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Needs Votes
16

PFE error messages display

It is possible to setup error messages to be displayed in Production floor execution, in order to control the quantities started/completed in the production orders operations (setup is in Production control>Setup>Manufacturing execution>Production order de...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Needs Votes
6

Add option “Default started quantity from the good quantity of the last operation” in Production floor execution

Business scenario:


  • In such a scenario where a specific operation has a planned route scrap if no scrap is actually reported (Full quniaity reported as a good quantity) while starting the next operation, it defaults to the planned requested quantity...

    Read more...

    2 Comments

    Read more... 2 Comments

    Category: Production Control (520)

    STATUS DETAILS
    Needs Votes
44

Enable Print management and ER support for production module reports

Enable print management settings for production control reports.

I could not find a way to substitute the production pick list (ProdPickList.Report) with a business document management report.

There is an ER option for the Warehouse management production pick list, but this report...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Under Review
1

Dynamics 365 Supply chain production indexation customer price increase methods with reason code

Wish there is an option to easily identify production price increases by starting period and/or period range


Example of potential reason codes:

Pandemic

Conflict Ukraine and Russia

Monkey virus

Transportation strike



Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Declined
2

Enhanced flexibility in updating a workcell on a kanban

Business Scenario

A kanban is planned on a workcell and needs replanning.

When the kanban is planned and picking has been executed, it is not possible to replan the kanban to another workcell.


It would be gap-solving if the production planner could replan the kanba...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Under Review
13

Change UoM when reporting the last operation as completed in the PFE so packing operations are supported

Scenario: last production job is a packing operation where multiple items are packed into pallets.


Current solution: worker needs to report progress multiple times specifying the correct pallet quantity. A LP label is printed each time.


Desired solution: pall...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Under Review
1

Dynamics 365 TMEC Production order certificate of origin at point of customer sales order

Wish there is an option to easily generate TMEC certificate of origin and easily email and/or print with number sequence at point of customer sales order or sales order billing.


Not featuring a TMEC production certificate of origin, user may potentially process conventionally ...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Under Review
88

When canceling an item, despite specifying a license plate, the system does not select the correct one on Production floor execution

The issue is that if a user books an incorrect quantity of an item (Report progress on PFE), when we want to cancel that booking via Report progress on PFE the system takes the wrong license plate. So basically the user which is working directly in the production via production floor execution...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Under Review
1

Bulk production orders "End" facility

Hi

My Self Amit Wagh

Phone No 9822574919

Email id amitwagh2596@gmail.com


We are very keenly awaiting the facility of bulk selection of Production orders in the module of Production control and Rout cards in a single click.


Regards,


...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (520)

STATUS DETAILS
Under Review