8

Same batch selection should be possible for BOM/Formula-lines too

in one of our customer projects we have the following requirement: Item A = Finished good Batch number tracked Item B = Semifinished good Bacth number tracked (Product type = Formula) Item A has Item B as a BOM-line Some customers require, that they only want to receive one unique Batch for It...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (226)

STATUS DETAILS
Needs Votes
9

Hours time field in routing operation should be restricted

The hours/time field in the routing op is a conversion factor. It is defaulting to 1. This means that the numbers in my time fields are "hours". For short run times we put in 0.0167 . Now my numbers mean "minutes". Maybe in some cases we put in "24" so now the numbers in my time fields stand f...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (226)

STATUS DETAILS
Needs Votes
3

Multi-site Job Budling

Scenario: A company has several manufacturing sites, all within the same legal entity and manufactures different components for different industries at each of the sites. However, there is one specialist operation that is based at one of the sites but receives works orders from the other sites...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (226)

STATUS DETAILS
Needs Votes
2

Automatic alternative route version

  • Ability to specify a non-active route version, which MRP could alternatively try, when scheduling on the requested date is not possible with the active route version.

    Speed is for some items dependent on the combination item + resource.

    e.g.: We fill Cans. Fill...

    Read more...

    0 Comments

    Read more... 0 Comments

    Category: Production Control (226)

    STATUS DETAILS
    Needs Votes
5

Allow RAF from MES (terminal/device) when backflushing failed

Currently it is not possible to post a Report as finished journal from the job card terminal, when a linked Picking list journal (backflushing) from the current or a previous operation cannot be posted. This is related to a common business scenario where the available stock in the system is di...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (226)

STATUS DETAILS
Needs Votes
5

When the subcontract production is scheduled with finite material purchase order work flow should be submitted only once

When the subcon production is scheduled with finite material enabled check mark, purchase order work flow should submit only once. As of now it is submitting multiple times which is taking time and users are also not happy with multiple approvals

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (226)

STATUS DETAILS
Under Review
0

Improve the unpick process for prod orders

When you unpick items on a Production order, the functionality is insufficient and not quite thought through. it asks you no question. After the unpick the item is located in the INPUT location of the Resource group. This means it is not truly available for a next pick. When the user is ready ...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (226)

STATUS DETAILS
Needs Votes
50

Job card terminal,check attachments on job for the production oder. the attachments from the BOM line is not shown

In standard D365 attachments from the following levels are shown on the job in the job card terminal:Production itemBOM headerRoute headerRoute operationProduction orderProduction BOM lineProduction Route operationwhy are attachments from the BOM lines not shown. this seems Obvious and neces...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (226)

STATUS DETAILS
Under Review
25

Planning production orders setup for several production orders running in multi shifts

With advanced multi-functional work center machine in production companies, you get more and more the following scenario to cover the work center planning. Example: Work center runs in 3 shifts. Shift 1 and 2 are under control by production people. 3 shift in the night is a ghost shift. This m...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (226)

STATUS DETAILS
Needs Votes
2

Warning messages when set up for subcontracting not complete

Subcontracted routing operations need to be completed. One can do this manually but much more convenient is to use the parameter in prod control or subcontract PO's. Upon receiving of such a PO, the subcon operation can be completed using a special route group. This set up is pretty subtle and...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (226)

STATUS DETAILS
Needs Votes