3

MO Reschedule -- Unable if 1 component is picked

Would like the option of using the Schedule MO button, to reschedule a MO even if a component has been picked.  (using component transaction entry)

Have not been able to figure out why kitting a component, would stop a user from rescheduling a MO.

thank you.

Read more...

0 Comments

Read more... 0 Comments

Category: Manufacturing (5)

STATUS DETAILS
New
2

full Reverse of Manufacturing receipt

we would ike, GP was able to reverse the MO receipt, in order to get back raw items into wip location, so we could make the receipt again, without need to create inventory adjusts and general entries manually

Read more...

0 Comments

Read more... 0 Comments

Category: Manufacturing (5)

STATUS DETAILS
New
2

Multiple MO Receipts -- Check box and click Post

MO Receipts are painfully slow in Dynamics GP. 

1  One at a time,  then wait and keep clicking multiple time for each.  A user has to sit and wait for Dynamics to process, to click each step.

2.  Can we get a window where we could click boxes by many MO...

Read more...

0 Comments

Read more... 0 Comments

Category: Manufacturing (5)

STATUS DETAILS
New
0

Engineering Drawing Group

Allow multi level grouping of drawings. Similar to a multi level BOM. For example: A group of Buttons may form the Panel and a group of Panels may form the Equipment. The Buttons, Panels and final equipment are all CAD drawings. They cannot be created as item numbers in IV00101. But we would lik...

Read more...

0 Comments

Read more... 0 Comments

Category: Manufacturing (5)

STATUS DETAILS
New
0

Engineering Drawings

When grouping Drawing Names within a Drawing Group allow assigning quantities to each Drawing Name. Similar to a BOM but at drawing level. That would be a more accurate drawing group for some companies.

Read more...

0 Comments

Read more... 0 Comments

Category: Manufacturing (5)

STATUS DETAILS
New