8

Notes added to the Sequence Number in MFG Order Routing Sequence Edit are overwriting the Op Code note

When a Note is updated on a new Sequence Number in MFG Order Routing Sequence Edit, that note overwrite the note on the WC Op Code note. This note should not be updated. The 'new' note is MO specific.

Read more...

0 Comments

Read more... 0 Comments

Category: Manufacturing (8)

STATUS DETAILS
Under Review
Ideas Administrator

We will look into adding this to a future release. Thank you for the suggestion.

Jodi Christiansen
PM, Microsoft 

5

full Reverse of Manufacturing receipt

we would ike, GP was able to reverse the MO receipt, in order to get back raw items into wip location, so we could make the receipt again, without need to create inventory adjusts and general entries manually

Read more...

0 Comments

Read more... 0 Comments

Category: Manufacturing (8)

STATUS DETAILS
New
5

MO Reschedule -- Unable if 1 component is picked

Would like the option of using the Schedule MO button, to reschedule a MO even if a component has been picked.  (using component transaction entry)

Have not been able to figure out why kitting a component, would stop a user from rescheduling a MO.

thank you.

Read more...

0 Comments

Read more... 0 Comments

Category: Manufacturing (8)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your suggestion. We will consider this functionality for a future release.  

Best regards. 

4

Multiple MO Receipts -- Check box and click Post

MO Receipts are painfully slow in Dynamics GP. 

1  One at a time,  then wait and keep clicking multiple time for each.  A user has to sit and wait for Dynamics to process, to click each step.

2.  Can we get a window where we could click boxes by many MO...

Read more...

0 Comments

Read more... 0 Comments

Category: Manufacturing (8)

STATUS DETAILS
Under Review
Ideas Administrator

Thank you for your suggestion. We will consider this functionality for a future release.  

Best regards. 

2

When using the Sequence Copy/Routing Duplicate to copy to a brand new item it is not incrementing the Next number in the MNH10000 correctly. [GPCR 68951]

Currently if using the Sequence Copy in MFG its not incrementing the Next number in the MNH10000 correctly. The same thing occurs if you use the Routing Duplicate process and causes the routing sequence notes to get mixed up. This issue does not have a current fix date. If you would like to se...

Read more...

0 Comments

Read more... 0 Comments

Category: Manufacturing (8)

STATUS DETAILS
New
0

Error running MRP Regeneration on multiple companies at the same time- : [GPCR 89145]

Currently when trying to run MRP Regenerations on multiple companies at the same time, you receive an error. If you would like to see the ability to run MRP Regen on multiple companies at the same time for future versions of GP, please vote for this suggestion.

Read more...

0 Comments

Read more... 0 Comments

Category: Manufacturing (8)

STATUS DETAILS
New
0

Engineering Drawing Group

Allow multi level grouping of drawings. Similar to a multi level BOM. For example: A group of Buttons may form the Panel and a group of Panels may form the Equipment. The Buttons, Panels and final equipment are all CAD drawings. They cannot be created as item numbers in IV00101. But we would lik...

Read more...

0 Comments

Read more... 0 Comments

Category: Manufacturing (8)

STATUS DETAILS
New
0

Engineering Drawings

When grouping Drawing Names within a Drawing Group allow assigning quantities to each Drawing Name. Similar to a BOM but at drawing level. That would be a more accurate drawing group for some companies.

Read more...

0 Comments

Read more... 0 Comments

Category: Manufacturing (8)

STATUS DETAILS
New