Notes added to the Sequence Number in MFG Order Routing Sequence Edit are overwriting the Op Code note
When a Note is updated on a new Sequence Number in MFG Order Routing Sequence Edit, that note overwrite the note on the WC Op Code note. This note should not be updated. The 'new' note is MO specific.
full Reverse of Manufacturing receipt
we would ike, GP was able to reverse the MO receipt, in order to get back raw items into wip location, so we could make the receipt again, without need to create inventory adjusts and general entries manually
MO Reschedule -- Unable if 1 component is picked
Would like the option of using the Schedule MO button, to reschedule a MO even if a component has been picked. (using component transaction entry)
Have not been able to figure out why kitting a component, would stop a user from rescheduling a MO.
thank you.
Thank you for your suggestion. We will consider this functionality for a future release.
Best regards.
Multiple MO Receipts -- Check box and click Post
MO Receipts are painfully slow in Dynamics GP.
1 One at a time, then wait and keep clicking multiple time for each. A user has to sit and wait for Dynamics to process, to click each step.
2. Can we get a window where we could click boxes by many MO...
Thank you for your suggestion. We will consider this functionality for a future release.
Best regards.
When using the Sequence Copy/Routing Duplicate to copy to a brand new item it is not incrementing the Next number in the MNH10000 correctly. [GPCR 68951]
Currently if using the Sequence Copy in MFG its not incrementing the Next number in the MNH10000 correctly. The same thing occurs if you use the Routing Duplicate process and causes the routing sequence notes to get mixed up. This issue does not have a current fix date. If you would like to se...
Purchasing a Make item Machine Variable Overhead account inconsistencies
When creating the Shipment for a Make item the Credit side of the 'Machine variable overhead' account should pull from the Variable Overhead Applied account on the Machine Definition. There seems to be inconsistencies in pulling this account from existing Routing Sequence numbers - some worked i...
Thank you for your suggestion. We will consider this functionality for a future release.
Best regards.
This posting is provided "AS IS" with no warranties, and confers no rights.
Error running MRP Regeneration on multiple companies at the same time- : [GPCR 89145]
Currently when trying to run MRP Regenerations on multiple companies at the same time, you receive an error. If you would like to see the ability to run MRP Regen on multiple companies at the same time for future versions of GP, please vote for this suggestion.
Engineering Drawing Group
Allow multi level grouping of drawings. Similar to a multi level BOM. For example: A group of Buttons may form the Panel and a group of Panels may form the Equipment. The Buttons, Panels and final equipment are all CAD drawings. They cannot be created as item numbers in IV00101. But we would lik...
Engineering Drawings
When grouping Drawing Names within a Drawing Group allow assigning quantities to each Drawing Name. Similar to a BOM but at drawing level. That would be a more accurate drawing group for some companies.
Administrator
We will look into adding this to a future release. Thank you for the suggestion.
Jodi Christiansen
PM, Microsoft