Public Profile
  • Travel Expense & Sustainability Co2e Calculation

    Hi,

    Can we please get a functionality similar to the one described in this blog post (Sustainability Accounting – Getting Started (Travel Expense) | Dynamics 365FO/AX Finance & Controlling (dynamicsax-fico.com)) into the standard travel expense module?

    Sustainability is a topic that is increasingly asked for by many companies and rather than designing something customer specific and re-inventing the wheel, it would be great having a standard functionality available for all D365 users.

    Many thanks for your consideration.

    Cheers,

    Ludwig

  • Subscription billing PO integration

    Hi,

    We need an integration of project operations and the new subscription billing module functionality.

    Many thanks for your consideration.

    Cheers,

    Ludwig

  • Subscription billing & Quotations

    Hi,

    We need an integration of subscription billing with quotations raised either in F&O or Project operations.

    Many thanks,

    Ludwig

  • Sustainability Accounting

    Hi,

    We need a sustainability accounting tool that is able to handle the forthcoming IFRS Sustainability standards.

    Among others, sustainability effects need to be able being integrated in corporate planning & budgeting, price calculations, financial statements, etc. which requires a couple of modifications in released products, costing / cost accounting, etc.

    Having the ability to make use of a separate sustainability posting layer for that purpose would be great.

    Many thanks,

    Ludwig

  • Leave and Absence Integration with Project Operations (stocked and non-stocked option)

    I created a calendar in the leave and absence module and added some holidays to it.

    If I open the calendar, I can see that the holidays specified are available there.

    Then I assigned this calendar to an employee in the project setup tab.

    My next step was to use the very same calendar as scheduling calendar on a project.

    I created a task for a period that includes a holiday and assigned my employee.

    Interestingly, the holiday is not considered as a day off / not available day in the project scheduling engine.

    Can you please fix this.

    Many thanks,

    Ludwig

  • Electronic Reporting destination setting

    Hi,

    If I set up an electronic reporting output destination that creates a report on a SharePoint document library "DL1" then I cannot setup a second electronic reporting output destination that puts the same report on a SharePoint document library "DL2".

    The report is always only put on to the first document library DL1.

    Would be great if this could be enhanced / fixed.

    Thanks,

    Ludwig


  • RCS / Electronic Reporting / Data Export

    Hi,

    In RCS one can generate data exports and reports based on data from Dataverse with the help of electronic reporting. Unfortunately, those exports have currently two major problems:

    Problem 1: Pagination and limit to 500 records per export

    Problem 2: No filter options for data residing in dataverse

    Would be great if you could fix those issues.

    Many thanks,

    Ludwig