Effective date of an Engineering Product Version - ECM
Today if I work with an Engineering Product with 2 versions:
V1: Active until the end of month;
V2: Active from the next month;
we are not able to create a sales order line for the V2 until the 1st day of next month because the system is not designed to check the “...
STATUS DETAILS
Needs Votes
Validity Date of the Route/Bom with ECM Module
Currently with ECM Module if we manage a date of validity in the Version (From Date/To Date) all the dates of Routes and BOMs (Engineering controlled) of the same Version are taken from the date of the item version. We cannot change the “from date” or “to date” of the route/BOM versions.
STATUS DETAILS
Needs Votes